IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
Reset
SIC 2221 Broadwoven Fabric Mills, Manmade
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0552 # 03 Y:1995 03 1995 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $77,800 $200,000 Not Implemented
GT0552 # 04 Y:1995 04 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $575 $191 Implemented
GT0552 # 05 Y:1995 05 1995 REPAIR AND ELIMINATE STEAM LEAKS $4,890 $500 Implemented
AM0237 # 01 Y:1995 01 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,890 $5,000 Implemented
AM0237 # 02 Y:1995 02 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,400 $41 Implemented
AM0237 # 03 Y:1995 03 1995 INSULATE BARE EQUIPMENT $2,700 $620 Implemented
AM0237 # 04 Y:1995 04 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,700 $1,000 Implemented
AM0237 # 05 Y:1995 05 1995 INSTALL SKYLIGHTS $1,300 $1,400 Not Implemented
AM0237 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $925 $550 Implemented
AM0237 # 07 Y:1995 07 1995 USE SYNTHETIC LUBRICANT $915 $0 Implemented
AM0237 # 08 Y:1995 08 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $910 $1,100 Implemented
TN0540 # 01 Y:1995 01 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $5,373 $2,280 Implemented
TN0540 # 02 Y:1995 02 1995 INSULATE BARE EQUIPMENT $4,639 $2,070 Not Implemented
TN0540 # 03 Y:1995 03 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $15,295 $17,920 Not Implemented
TN0540 # 04 Y:1995 04 1995 INSTALL TIMERS AND/OR THERMOSTATS $3,993 $2,290 Implemented
TN0540 # 05 Y:1995 05 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,361 $0 Not Implemented
TN0540 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,119 $1,845 Not Implemented
GT0536 # 01 Y:1994 01 1994 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $76,070 $30,000 Not Implemented
GT0536 # 02 Y:1994 02 1994 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $350 $1,000 Not Implemented
GT0536 # 03 Y:1994 03 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,520 $4,420 Not Implemented
GT0536 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,310 $34,680 Not Implemented
GT0536 # 05 Y:1994 05 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,108 $2,500 Not Implemented
GT0536 # 06 Y:1994 06 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,880 $720 Not Implemented
GT0492 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,090 $450 Implemented
GT0492 # 02 Y:1993 02 1993 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $7,880 $11,800 Not Implemented