Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
37
matching recommendationsSIC | 2221 | Broadwoven Fabric Mills, Manmade |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0567 # 09 Y:1995 | 09 | 1995 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $186,200 | $100,000 | Implemented |
GT0567 # 05 Y:1995 | 05 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,420 | $45,060 | Implemented |
GT0567 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,340 | $38,280 | Implemented |
GT0567 # 03 Y:1995 | 03 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,990 | $145 | Implemented |
GT0567 # 02 Y:1995 | 02 | 1995 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $17,500 | $16,500 | Not Implemented |
GT0567 # 01 Y:1995 | 01 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $14,700 | $900 | Implemented |
GT0567 # 06 Y:1995 | 06 | 1995 | REPAIR AND ELIMINATE STEAM LEAKS | $6,860 | $700 | Implemented |
GT0567 # 07 Y:1995 | 07 | 1995 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $58,060 | $37,200 | Implemented |
GT0567 # 08 Y:1995 | 08 | 1995 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,650 | $0 | Implemented |
WV0072 # 09 Y:1995 | 09 | 1995 | INSULATE BARE EQUIPMENT | $155 | $171 | Implemented |
WV0072 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $176 | $320 | Not Implemented |
WV0072 # 02 Y:1995 | 02 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $6,004 | $14,890 | Implemented |
WV0072 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,940 | $1,560 | Implemented |
WV0072 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $271 | $295 | Implemented |
WV0072 # 05 Y:1995 | 05 | 1995 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $1,589 | $0 | Not Implemented |
WV0072 # 06 Y:1995 | 06 | 1995 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $1,253 | $2,300 | Implemented |
WV0072 # 07 Y:1995 | 07 | 1995 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $643 | $1,566 | Implemented |
WV0072 # 08 Y:1995 | 08 | 1995 | INSTALL AUTOMATIC STACK DAMPER | $6,039 | $560 | Implemented |
GT0552 # 04 Y:1995 | 04 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $575 | $191 | Implemented |
GT0552 # 03 Y:1995 | 03 | 1995 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $77,800 | $200,000 | Not Implemented |
GT0552 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $4,400 | $0 | Implemented |
GT0552 # 05 Y:1995 | 05 | 1995 | REPAIR AND ELIMINATE STEAM LEAKS | $4,890 | $500 | Implemented |
GT0552 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $23,000 | $208,000 | Implemented |
AM0237 # 01 Y:1995 | 01 | 1995 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,890 | $5,000 | Implemented |
AM0237 # 02 Y:1995 | 02 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $5,400 | $41 | Implemented |