IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

73

matching recommendations
Reset
SIC 2251 Women's Full-Length and Knee-Length Hosiery, Except Socks
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0136 # 04 Y:1998 04 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $10,803 $24,103 Not Implemented
NC0136 # 03 Y:1998 03 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $6,035 $1,630 Not Implemented
NC0136 # 02 Y:1998 02 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,667 $600 Implemented
NC0136 # 01 Y:1998 01 1998 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $4,876 $100 Implemented
NC0060 # 04 Y:1995 04 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $4,567 $15,000 Not Implemented
NC0060 # 07 Y:1995 07 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $463 $1,556 Implemented
NC0060 # 06 Y:1995 06 1995 INSTALL / REPAIR INSULATION ON STEAM LINES $2,634 $4,545 Implemented
NC0060 # 05 Y:1995 05 1995 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,838 $15,000 Not Implemented
NC0060 # 03 Y:1995 03 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $354 $2,430 Not Implemented
NC0060 # 02 Y:1995 02 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $7,215 $19,196 Not Implemented
NC0060 # 01 Y:1995 01 1995 TURN OFF EQUIPMENT WHEN NOT IN USE $1,626 $0 Implemented
NC0060 # 08 Y:1995 08 1995 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,418 $1,500 Implemented
NC0046 # 03 Y:1995 03 1995 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION $13,396 $12,000 Not Implemented
NC0046 # 01 Y:1995 01 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $251 $330 Implemented
NC0046 # 02 Y:1995 02 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,179 $6,550 Implemented
NC0046 # 04 Y:1995 04 1995 MAKE ICE DURING OFF PEAK HOURS FOR COOLING $18,043 $36,000 Not Implemented
NC0046 # 05 Y:1995 05 1995 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $605 $550 Implemented
NC0046 # 06 Y:1995 06 1995 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $784 $600 Implemented
NC0043 # 07 Y:1994 07 1994 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,342 $10,000 Not Implemented
NC0043 # 06 Y:1994 06 1994 ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA $4,592 $27,887 Not Implemented
NC0043 # 05 Y:1994 05 1994 RECOVER WASTE HEAT FROM EQUIPMENT $515 $1,300 Not Implemented
NC0043 # 04 Y:1994 04 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $198 $310 Not Implemented
NC0043 # 03 Y:1994 03 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $248 $120 Implemented
NC0043 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,024 $13,329 Implemented
NC0043 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,151 $1,502 Implemented