Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | North Carolina State |
---|---|
Assessment Year | 1998 |
Principal Product | Pantyhose |
NAICS | n/a |
SIC | 2251 - Women's Full-Length and Knee-Length Hosiery, Except Socks |
Sales | $10,000,000-$50,000,000 |
# of Employees | 200 |
Plant Area (Sq.Ft.) | 78,000 |
Annual Production | 18,000,000 Pieces |
Production Hrs. Annual | 7,200 |
Location (State) | NC |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $189,879 | 6,330,891 | kWh | $0.03 |
Electricity Demand | $292,743 | 14,775 | kW-months/year | $19.81 |
Electricity Fees | $11,222 | - | $ | - |
Natural Gas | $220,698 | 51,669 | MMBtu | $4.27 |
Fuel Oil #2 | $16,595 | 3,852 | MMBtu | $4.31 |
TOTAL ENERGY COSTS | $732,681 | |||
RECOMMENDED SAVINGS* | $50,925 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $13,824 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $4,876 Cost: $100 |
- | - | - | - | $4,876 | 1,142 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,876 1,142 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO |
Savings: $4,667 Cost: $600 |
- | - | - | - | $4,667 | 1,093 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$4,667 1,093 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $6,035 Cost: $1,630 |
$3,358 | 107,268 | $1,572 | 179 | - | - | - | - | $1,105 | - | - | - |
$3,358 107,268 kWh |
$1,572 179 kW-months/year |
- - MMBtu |
- - lb |
$1,105 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.2442 PREHEAT COMBUSTION AIR WITH WASTE HEAT |
Savings: $10,803 Cost: $24,103 |
- | - | - | - | $10,803 | 2,562 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$10,803 2,562 MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $4,000 Cost: $1,000 |
$4,000 | 127,784 | - | - | - | - | - | - | - | - | - | - |
$4,000 127,784 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $1,263 Cost: $5,200 |
- | - | - | - | - | - | $1,263 | 12,500 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,263 12,500 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER |
Savings: $281 Cost: $200 |
- | - | - | - | - | - | $281 | 18,750 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$281 18,750 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 4.513 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS |
Savings: $19,000 Cost: $62,834 |
- | - | - | - | - | - | - | - | - | - | $19,000 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
$19,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,925 Cost: $95,667 |
$7,358 | 235,052 | $1,572 | 179 | $20,346 | 4,797 | $1,544 | 31,250 | $1,105 | - | $19,000 | - | $7,358 235,052 kWh |
$1,572 179 kW-months/year |
$20,346 4,797 MMBtu |
$1,544 31,250 lb |
$1,105 - $ |
$19,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $13,824 Cost: $1,900 |
$4,000 | 127,784 | - | - | $9,543 | 2,235 | $281 | 18,750 | - | - | - | - | $4,000 127,784 kWh |
- - kW-months/year |
$9,543 2,235 MMBtu |
$281 18,750 lb |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Ancillary Material Cost | By-product Production |