Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
487
matching recommendationsSIC | 226 | Textile Finishing, Except Wool |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
CM1017 # 01 Y:2023 | 01 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $4,638 | $57,344 | Implemented |
CM1017 # 02 Y:2023 | 02 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $738 | $0 | Implemented |
CM1017 # 03 Y:2023 | 03 | 2023 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,890 | $15,750 | Implemented |
CM1017 # 04 Y:2023 | 04 | 2023 | REPLACE BOILER | $20,045 | $41,481 | Implemented |
CM1017 # 05 Y:2023 | 05 | 2023 | USE DOUBLE OR TRIPLE GLAZED WINDOWS TO MAINTAIN HIGHER RELATIVE HUMIDITY AND TO REDUCE HEAT LOSSES | $1,538 | $4,396 | Implemented |
CM1017 # 06 Y:2023 | 06 | 2023 | INSTALL SYSTEM TO COLLECT SCRAP | $9,880 | $2,306 | Not Implemented |
CM1017 # 07 Y:2023 | 07 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $1,464 | $3,500 | Implemented |
NC0658 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,619 | $5,000 | n/a |
NC0658 # 02 Y:2020 | 02 | 2020 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $23,051 | $15,000 | n/a |
NC0658 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $170 | $400 | n/a |
NC0658 # 04 Y:2020 | 04 | 2020 | REPLACE TREATED WATER WITH WELL / SURFACE WATER | $92,941 | $500 | n/a |
NC0658 # 01 Y:2020 | 01 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $8,055 | $3,000 | n/a |
NC0658 # 05 Y:2020 | 05 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,952 | $4,258 | n/a |
MA0821 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $490 | $1,785 | Not Implemented |
MA0821 # 03 Y:2020 | 03 | 2020 | OPTIMIZE PLANT POWER FACTOR | $997 | $1,400 | Not Implemented |
MA0821 # 02 Y:2020 | 02 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $8,991 | $23,275 | Not Implemented |
MA0821 # 01 Y:2020 | 01 | 2020 | USE MINIMUM SAFE OVEN VENTILATION | $48,924 | $61,470 | Not Implemented |
LE0487 # 07 Y:2020 | 07 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,408 | $16,552 | Implemented |
LE0487 # 10 Y:2020 | 10 | 2020 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,832 | $8,000 | Implemented |
LE0487 # 11 Y:2020 | 11 | 2020 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,929 | $30,000 | Implemented |
LE0487 # 03 Y:2020 | 03 | 2020 | REPAIR OR REPLACE STEAM TRAPS | $11,267 | $5,000 | Implemented |
LE0487 # 09 Y:2020 | 09 | 2020 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $4,451 | $15,000 | Implemented |
LE0487 # 05 Y:2020 | 05 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,823 | $10,000 | Implemented |
LE0487 # 04 Y:2020 | 04 | 2020 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,594 | $10,000 | Not Implemented |
LE0487 # 08 Y:2020 | 08 | 2020 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $27,628 | $85,000 | Not Implemented |