IAC Assessment: SU0556
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: SU0556
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Syracuse University
Assessment Year 2024
Principal Product Textiles
NAICS 313310 - Textile and Fabric Finishing Mills
SIC 2269 - Finishing Plants, Nec
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 144,000
Annual Production 2,000,000 Pounds
Production Hrs. Annual 4,940
Location (State) NY
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $241,034 2,204,649 kWh $0.11
Electricity Demand $105,505 8,367 kW-months/year $12.61
Electricity Fees $17,056 - $ -
Natural Gas $287,078 76,129 MMBtu $3.77
LPG $11,097 346 MMBtu $32.04
TOTAL ENERGY COSTS $661,771
RECOMMENDED SAVINGS* $357,319 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
01: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$1,634
Cost:
-
- - $1,634 130 - - - - - - -
-
kWh
$1,634
130
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
02: 2.7122 DISCONNECT BALLASTS Savings:
$1,105
Cost:
-
$16 144 $1,090 86 - - - - - - $16
144
kWh
$1,090
86
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
03: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,127
Cost:
-
- - - - - - - - $1,127 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,127
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,272
Cost:
-
- - $5,272 418 - - - - - - -
-
kWh
$5,272
418
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
05: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$1,883
Cost:
-
$1,883 17,272 - - - - - - - - $1,883
17,272
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,492
Cost:
$63
$1,492 13,683 - - - - - - - - $1,492
13,683
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$11,128
Cost:
$993
- - - - $11,128 2,870 - - - - -
-
kWh
-
-
kW-months/year
$11,128
2,870
MMBtu
-
-
MMBtu
-
-
$
08: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$42,220
Cost:
$8,541
- - - - $42,220 10,944 - - - - -
-
kWh
-
-
kW-months/year
$42,220
10,944
MMBtu
-
-
MMBtu
-
-
$
09: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$998
Cost:
$553
- - - - $998 258 - - - - -
-
kWh
-
-
kW-months/year
$998
258
MMBtu
-
-
MMBtu
-
-
$
10: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$18,784
Cost:
$12,106
- - - - $18,784 4,860 - - - - -
-
kWh
-
-
kW-months/year
$18,784
4,860
MMBtu
-
-
MMBtu
-
-
$
11: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$7,286
Cost:
$4,767
- - - - $7,286 1,885 - - - - -
-
kWh
-
-
kW-months/year
$7,286
1,885
MMBtu
-
-
MMBtu
-
-
$
12: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$12,916
Cost:
$12,528
$10,083 92,503 $2,834 225 - - - - - - $10,083
92,503
kWh
$2,834
225
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
13: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$766
Cost:
$771
$458 4,205 $73 6 - - - - $235 - $458
4,205
kWh
$73
6
kW-months/year
-
-
MMBtu
-
-
MMBtu
$235
-
$
14: 2.6211 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES Savings:
$402
Cost:
$537
$402 3,679 - - - - - - - - $402
3,679
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
15: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$557
Cost:
$1,283
$557 5,092 - - - - - - - - $557
5,092
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
16: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$9,480
Cost:
$25,942
$(-1,617) (-14,835) - - - - $11,097 346 - - $(-1,617)
(-14,835)
kWh
-
-
kW-months/year
-
-
MMBtu
$11,097
346
MMBtu
-
-
$
17: 2.9114 USE SOLAR HEAT TO MAKE ELECTRICTY Savings:
$240,268
Cost:
$897,305
$240,268 2,204,290 - - - - - - - - $240,268
2,204,290
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$357,319
Cost:
$965,389
$253,541 2,326,033 $10,902 865 $80,417 20,818 $11,097 346 $1,362 - $253,541
2,326,033
kWh
$10,902
865
kW-months/year
$80,417
20,818
MMBtu
$11,097
346
MMBtu
$1,362
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas LPG One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas LPG One-time Revenue or Avoided Cost