Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
510
matching recommendationsSIC | 226 | Textile Finishing, Except Wool |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
HO0171 # 08 Y:1998 | 08 | 1998 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $64,007 | $2,200 | Implemented |
HO0171 # 09 Y:1998 | 09 | 1998 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $10,116 | $1,000 | Implemented |
MA0408 # 01 Y:1998 | 01 | 1998 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $99,832 | $87,100 | Not Implemented |
MA0408 # 02 Y:1998 | 02 | 1998 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $7,625 | $8,625 | Not Implemented |
MA0408 # 03 Y:1998 | 03 | 1998 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $2,188 | $1,000 | Implemented |
MA0408 # 04 Y:1998 | 04 | 1998 | USE MAGNETIC TECHNOLOGY TO TREAT WATER | $2,939 | $5,520 | Not Implemented |
MA0408 # 05 Y:1998 | 05 | 1998 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,735 | $100 | Implemented |
MA0408 # 06 Y:1998 | 06 | 1998 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $1,487 | $2,675 | Not Implemented |
MA0408 # 07 Y:1998 | 07 | 1998 | INSULATE BARE EQUIPMENT | $644 | $513 | Implemented |
MA0408 # 08 Y:1998 | 08 | 1998 | UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS | $27,232 | $250,000 | Implemented |
MA0405 # 01 Y:1997 | 01 | 1997 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $110,455 | $131,100 | Not Implemented |
MA0405 # 02 Y:1997 | 02 | 1997 | MINIMIZE WATER USAGE | $25,165 | $3,413 | Implemented |
MA0405 # 03 Y:1997 | 03 | 1997 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,177 | $28,900 | Implemented |
MA0405 # 04 Y:1997 | 04 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,631 | $266 | Not Implemented |
MA0405 # 05 Y:1997 | 05 | 1997 | OPTIMIZE PLANT POWER FACTOR | $2,412 | $5,275 | Not Implemented |
MA0405 # 06 Y:1997 | 06 | 1997 | INSTALL OCCUPANCY SENSORS | $1,335 | $1,620 | Implemented |
MA0405 # 07 Y:1997 | 07 | 1997 | MINIMIZE WATER USAGE | $1,049 | $2,125 | Not Implemented |
MA0405 # 08 Y:1997 | 08 | 1997 | PREHEAT COMBUSTION AIR WITH WASTE HEAT | $531 | $600 | Not Implemented |
UL0186 # 01 Y:1997 | 01 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $362 | $200 | Not Implemented |
UL0186 # 02 Y:1997 | 02 | 1997 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,928 | $20,490 | Not Implemented |
UL0186 # 03 Y:1997 | 03 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,550 | $30 | Not Implemented |
UL0186 # 04 Y:1997 | 04 | 1997 | METER WASTE WATER | $53,265 | $4,500 | Not Implemented |
UL0186 # 05 Y:1997 | 05 | 1997 | IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) | $2,560 | $600 | Not Implemented |
UL0186 # 06 Y:1997 | 06 | 1997 | CLEAR AND RENT EXISTING SPACE | $1,880,000 | $0 | Not Implemented |
NC0129 # 01 Y:1997 | 01 | 1997 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $25,317 | $11,417 | Not Implemented |