IAC logo
IAC Assessment: UL0186
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UL0186
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Louisville
Assessment Year 1997
Principal Product Stone washed denim clothing
NAICS n/a
SIC 2263 -
Sales $1,000,000-$5,000,000
# of Employees 200
Plant Area (Sq.Ft.) 240,000
Annual Production 4,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) IN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $101,189 1,913,247 kWh $0.05
Electricity Demand $89,619 8,527 kW-months/year $10.51
Natural Gas $336,243 97,072 MMBtu $3.46
TOTAL ENERGY COSTS $653,176
RECOMMENDED SAVINGS* $1,941,665 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$362
Cost:
$200
$204 3,810 $158 15 - - - - $204
3,810
kWh
$158
15
kW-months/year
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,928
Cost:
$20,490
$2,300 43,669 $628 60 - - - - $2,300
43,669
kWh
$628
60
kW-months/year
-
-
lb
-
-
$
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,550
Cost:
$30
$2,000 38,101 $550 52 - - - - $2,000
38,101
kWh
$550
52
kW-months/year
-
-
lb
-
-
$
04: 3.4155 METER WASTE WATER Savings:
$53,265
Cost:
$4,500
- - - - - - $53,265 - -
-
kWh
-
-
kW-months/year
-
-
lb
$53,265
-
$
05: 3.7212 IMPROVED MATERIAL HANDLING (MIXING AND TRANSFER) Savings:
$2,560
Cost:
$600
- - - - $2,560 4,235 - - -
-
kWh
-
-
kW-months/year
$2,560
4,235
lb
-
-
$
06: 4.521 CLEAR AND RENT EXISTING SPACE Savings:
$1,880,000
Cost:
-
- - - - - - $1,880,000 - -
-
kWh
-
-
kW-months/year
-
-
lb
$1,880,000
-
$
TOTAL RECOMMENDED Savings:
$1,941,665
Cost:
$25,820
$4,504 85,580 $1,336 127 $2,560 4,235 $1,933,265 - $4,504
85,580
kWh
$1,336
127
kW-months/year
$2,560
4,235
lb
$1,933,265
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ lb $ $
Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Solid Waste (non-haz) Administrative Changes