IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
Reset
SIC 226 Textile Finishing, Except Wool
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0417 # 01 Y:1998 01 1998 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $16,605 $14,585 Not Implemented
MA0417 # 02 Y:1998 02 1998 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $37,587 $40,000 Not Implemented
MA0417 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $2,062 $6,430 Not Implemented
MA0417 # 04 Y:1998 04 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $246 $195 Implemented
HO0171 # 09 Y:1998 09 1998 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $10,116 $1,000 Implemented
HO0171 # 08 Y:1998 08 1998 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $64,007 $2,200 Implemented
HO0171 # 07 Y:1998 07 1998 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $54,070 $24,050 Not Implemented
HO0171 # 06 Y:1998 06 1998 INSULATE BARE EQUIPMENT $383 $190 Not Implemented
HO0171 # 05 Y:1998 05 1998 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $8,531 $3,500 Not Implemented
HO0171 # 04 Y:1998 04 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,188 $50 Implemented
HO0171 # 03 Y:1998 03 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $3,021 $5,131 Implemented
HO0171 # 02 Y:1998 02 1998 INSTALL OCCUPANCY SENSORS $5,886 $2,000 Not Implemented
HO0171 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,328 $30,330 Not Implemented
MA0408 # 08 Y:1998 08 1998 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS $27,232 $250,000 Implemented
MA0408 # 07 Y:1998 07 1998 INSULATE BARE EQUIPMENT $644 $513 Implemented
MA0408 # 06 Y:1998 06 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $1,487 $2,675 Not Implemented
MA0408 # 05 Y:1998 05 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,735 $100 Implemented
MA0408 # 04 Y:1998 04 1998 USE MAGNETIC TECHNOLOGY TO TREAT WATER $2,939 $5,520 Not Implemented
MA0408 # 03 Y:1998 03 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,188 $1,000 Implemented
MA0408 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,625 $8,625 Not Implemented
MA0408 # 01 Y:1998 01 1998 PREHEAT COMBUSTION AIR WITH WASTE HEAT $99,832 $87,100 Not Implemented