Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
249
matching recommendationsSIC | 2269 | Finishing Plants, Nec |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2434 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,537 | $6,440 | n/a |
KS2434 # 05 Y:2024 | 05 | 2024 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $7,512 | $73,720 | n/a |
KS2434 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $48,853 | $469,862 | n/a |
KS2434 # 01 Y:2024 | 01 | 2024 | REPAIR AND ELIMINATE STEAM LEAKS | $2,723 | $1,383 | n/a |
KS2434 # 02 Y:2024 | 02 | 2024 | INSTALL / REPAIR INSULATION ON STEAM LINES | $13,772 | $52,090 | n/a |
KS2434 # 03 Y:2024 | 03 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,889 | $6,569 | n/a |
SU0556 # 12 Y:2024 | 12 | 2024 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,916 | $12,528 | n/a |
SU0556 # 11 Y:2024 | 11 | 2024 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $7,286 | $4,767 | n/a |
SU0556 # 16 Y:2024 | 16 | 2024 | ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION | $9,480 | $25,942 | n/a |
SU0556 # 14 Y:2024 | 14 | 2024 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $402 | $537 | n/a |
SU0556 # 15 Y:2024 | 15 | 2024 | INSTALL OCCUPANCY SENSORS | $557 | $1,283 | n/a |
SU0556 # 08 Y:2024 | 08 | 2024 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $42,220 | $8,541 | n/a |
SU0556 # 07 Y:2024 | 07 | 2024 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $11,128 | $993 | n/a |
SU0556 # 10 Y:2024 | 10 | 2024 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS | $18,784 | $12,106 | n/a |
SU0556 # 03 Y:2024 | 03 | 2024 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,127 | $0 | n/a |
SU0556 # 05 Y:2024 | 05 | 2024 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,883 | $0 | n/a |
SU0556 # 02 Y:2024 | 02 | 2024 | DISCONNECT BALLASTS | $1,105 | $0 | n/a |
SU0556 # 01 Y:2024 | 01 | 2024 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,634 | $0 | n/a |
SU0556 # 17 Y:2024 | 17 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $240,268 | $897,305 | n/a |
SU0556 # 06 Y:2024 | 06 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,492 | $63 | n/a |
SU0556 # 04 Y:2024 | 04 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,272 | $0 | n/a |
SU0556 # 13 Y:2024 | 13 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $766 | $771 | n/a |
SU0556 # 09 Y:2024 | 09 | 2024 | REPAIR OR REPLACE STEAM TRAPS | $998 | $553 | n/a |
MA0821 # 01 Y:2020 | 01 | 2020 | USE MINIMUM SAFE OVEN VENTILATION | $48,924 | $61,470 | Not Implemented |
MA0821 # 04 Y:2020 | 04 | 2020 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $490 | $1,785 | Not Implemented |