IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

647

matching recommendations
Reset
SIC 2273 Carpets And Rugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0920 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,465 $3,500 Implemented
GT0920 # 03 Y:2019 03 2019 INSULATE BARE EQUIPMENT $360 $386 Implemented
GT0920 # 02 Y:2019 02 2019 INSULATE BARE EQUIPMENT $5,826 $1,645 Implemented
GT0920 # 01 Y:2019 01 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,551 $629 Implemented
LE0421 # 13 Y:2016 13 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $700 $3,500 Implemented
LE0421 # 12 Y:2016 12 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,515 $16,250 Not Implemented
LE0421 # 11 Y:2016 11 2016 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $971 $4,320 Not Implemented
LE0421 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,106 $4,800 Implemented
LE0421 # 09 Y:2016 09 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,870 $7,590 Implemented
LE0421 # 08 Y:2016 08 2016 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $697 $2,000 Implemented
LE0421 # 07 Y:2016 07 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,592 $9,000 Not Implemented
LE0421 # 06 Y:2016 06 2016 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $550 $1,000 Not Implemented
LE0421 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,141 $3,125 Not Implemented
LE0421 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $965 $725 Implemented
LE0421 # 03 Y:2016 03 2016 INSTALL TIMERS AND/OR THERMOSTATS $2,781 $1,800 Implemented
LE0421 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,883 $1,000 Implemented
LE0421 # 01 Y:2016 01 2016 INSTALL OCCUPANCY SENSORS $14,759 $2,175 Implemented
TT0170 # 01 Y:2016 01 2016 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $13,371 $30,500 Not Implemented
TT0170 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $2,212 $1,500 Implemented
TT0170 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,194 $3,000 Implemented
TT0170 # 04 Y:2016 04 2016 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $1,630 $3,525 Implemented
TT0170 # 05 Y:2016 05 2016 INSULATE BARE EQUIPMENT $1,494 $130 Implemented
TT0156 # 01 Y:2015 01 2015 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $31,925 $52,507 Not Implemented
TT0156 # 02 Y:2015 02 2015 REPAIR AND ELIMINATE STEAM LEAKS $13,551 $15,000 Not Implemented
TT0156 # 03 Y:2015 03 2015 RECOVER WASTE HEAT FROM EQUIPMENT $2,241 $10,000 Not Implemented