IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

41

matching recommendations
Reset
SIC 2273 Carpets And Rugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0626 # 08 Y:1997 08 1997 USE A DIFFERENT OR RECYCLED RAW MATERIAL $1,315 $438 Not Implemented
GT0626 # 07 Y:1997 07 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $26,666 $4,200 Implemented
GT0626 # 06 Y:1997 06 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,570 $7,580 Not Implemented
GT0626 # 05 Y:1997 05 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $400 $620 Implemented
GT0626 # 04 Y:1997 04 1997 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $2,730 $1,420 Not Implemented
GT0626 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,580 $11,230 Not Implemented
GT0626 # 02 Y:1997 02 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $21,185 $0 Implemented
GT0626 # 01 Y:1997 01 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,741 $950 Implemented
GT0622 # 08 Y:1997 08 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $207,108 $330,000 Not Implemented
GT0622 # 01 Y:1997 01 1997 INSTALL / REPAIR INSULATION ON STEAM LINES $980 $2,000 Implemented
GT0622 # 02 Y:1997 02 1997 REPAIR AND ELIMINATE STEAM LEAKS $3,470 $1,200 Implemented
GT0622 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $94 $240 Not Implemented
GT0622 # 04 Y:1997 04 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,626 $300 Implemented
GT0622 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,060 $632 Implemented
GT0622 # 06 Y:1997 06 1997 MINIMIZE WATER USAGE $533 $0 Not Implemented
GT0622 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,999 $3,200 Not Implemented
GT0622 # 09 Y:1997 09 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $6,890 $0 Not Implemented
GT0614 # 07 Y:1997 07 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $6,643 $4,500 Implemented
GT0614 # 10 Y:1997 10 1997 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $365,300 $800,000 Not Implemented
GT0614 # 09 Y:1997 09 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $10,701 $5,100 Not Implemented
GT0614 # 08 Y:1997 08 1997 ENHANCE SENSITIVITY OF TEMPERATURE CONTROL AND CUTOFF $23,450 $300 Not Implemented
GT0614 # 06 Y:1997 06 1997 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $94,300 $40,000 Not Implemented
GT0614 # 05 Y:1997 05 1997 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $365,536 $238,000 Not Implemented
GT0614 # 04 Y:1997 04 1997 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $18,883 $12,000 Not Implemented
GT0614 # 03 Y:1997 03 1997 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,030 $17,130 Not Implemented