IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

48

matching recommendations
Reset
SIC 2273 Carpets And Rugs
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0704 # 07 Y:2000 07 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,499 $78,601 Implemented
GT0704 # 06 Y:2000 06 2000 USE MINIMUM SAFE OVEN VENTILATION $60,060 $5,200 Not Implemented
GT0704 # 05 Y:2000 05 2000 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $30,230 $43,056 Implemented
GT0704 # 04 Y:2000 04 2000 COMBINE UTILITY METERS $2,640 $0 Not Implemented
GT0704 # 03 Y:2000 03 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,410 $0 Not Implemented
GT0704 # 02 Y:2000 02 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,800 $32,760 Not Implemented
GT0704 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,348 $11,544 Implemented
GT0695 # 05 Y:2000 05 2000 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $14,296 $28,000 n/a
GT0695 # 01 Y:2000 01 2000 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $2,267 $0 n/a
GT0695 # 02 Y:2000 02 2000 ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS $3,232 $900 n/a
GT0695 # 03 Y:2000 03 2000 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $700 $450 n/a
GT0695 # 04 Y:2000 04 2000 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $888 $0 n/a
GT0695 # 06 Y:2000 06 2000 RECOVER AND REUSE WASTE MATERIAL $6,035 $10,000 n/a
GT0695 # 07 Y:2000 07 2000 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,980 $1,000 n/a
GT0695 # 08 Y:2000 08 2000 COMBINE UTILITY METERS $15,392 $0 n/a
GT0695 # 09 Y:2000 09 2000 INSULATE BARE EQUIPMENT $2,000 $5,400 n/a
GT0686 # 05 Y:2000 05 2000 INSULATE BARE EQUIPMENT $1,280 $1,105 Implemented
GT0686 # 12 Y:2000 12 2000 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $4,730 $0 Not Implemented
GT0686 # 11 Y:2000 11 2000 REUSE / RECYCLE/ SELL PAPER PRODUCTS $540 $0 Not Implemented
GT0686 # 10 Y:2000 10 2000 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $789 $944 Implemented
GT0686 # 09 Y:2000 09 2000 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $10,132 $49,180 Implemented
GT0686 # 08 Y:2000 08 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,990 $2,430 Implemented
GT0686 # 07 Y:2000 07 2000 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $7,650 $17,105 Not Implemented
GT0686 # 06 Y:2000 06 2000 INSULATE BARE EQUIPMENT $4,025 $9,895 Not Implemented
GT0686 # 04 Y:2000 04 2000 INSULATE BARE EQUIPMENT $1,400 $500 Implemented