IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

301

matching recommendations
Reset
SIC 228 Yarn And Thread Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0280 # 03 Y:1986 03 1986 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,064 $16,300 Implemented
GT0280 # 04 Y:1986 04 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,846 $55,650 Not Implemented
GT0280 # 05 Y:1986 05 1986 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $7,496 $5,921 Implemented
GT0280 # 06 Y:1986 06 1986 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $15,959 $35,750 Not Implemented
GT0271 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,850 $830 Implemented
GT0271 # 02 Y:1985 02 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,600 $35,000 Implemented
GT0271 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,149 $2,978 Implemented
GT0271 # 04 Y:1985 04 1985 IMPROVE LUBRICATION PRACTICES $20,435 $0 Implemented
GT0271 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $16,058 $1,898 Implemented
GT0271 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,200 $5,000 Implemented
GT0252 # 01 Y:1985 01 1985 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,225 $500 Implemented
GT0252 # 02 Y:1985 02 1985 REDUCE AIR CONDITIONING LOAD BY EVAPORATING WATER FROM ROOF $9,800 $41,660 Not Implemented
GT0252 # 03 Y:1985 03 1985 KEEP BOILER TUBES CLEAN $3,730 $5,000 Implemented
GT0252 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,283 $2,928 Implemented
GT0252 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,220 $4,800 Implemented
GT0252 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,490 $0 Implemented
GT0252 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $12,650 $10,000 Not Implemented
GT0228 # 01 Y:1984 01 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $2,400 $5,000 Not Implemented
GT0228 # 02 Y:1984 02 1984 INCREASE AMOUNT OF CONDENSATE RETURNED $3,900 $6,000 Not Implemented
GT0228 # 03 Y:1984 03 1984 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,500 $1,654 Implemented
GT0228 # 04 Y:1984 04 1984 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $2,292 $2,600 Not Implemented
GT0228 # 05 Y:1984 05 1984 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $637 $500 Implemented
GT0228 # 06 Y:1984 06 1984 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,814 $2,100 Implemented
GT0228 # 07 Y:1984 07 1984 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $3,600 $3,000 Implemented
GT0233 # 01 Y:1984 01 1984 USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER $9,800 $8,000 Not Implemented