IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

42

matching recommendations
Reset
SIC 2282 Throwing And Winding Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0867 # 06 Y:2009 06 2009 USE SYNTHETIC LUBRICANT $1,440 $0 Implemented
GT0867 # 05 Y:2009 05 2009 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $10,949 $0 Not Implemented
GT0867 # 04 Y:2009 04 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $14,518 $6,000 Implemented
GT0867 # 03 Y:2009 03 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $17,426 $3,250 Implemented
GT0867 # 02 Y:2009 02 2009 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS $8,794 $4,000 Implemented
GT0867 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $52,318 $89,971 Not Implemented
GT0739 # 05 Y:2002 05 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,700 $300 Implemented
GT0739 # 01 Y:2002 01 2002 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL $19,440 $122,500 Not Implemented
GT0739 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,592 $1,900 Implemented
GT0739 # 03 Y:2002 03 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,450 $50,177 Implemented
GT0739 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $186 $16,560 Not Implemented
GT0739 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,130 $7,000 Not Implemented
GT0739 # 07 Y:2002 07 2002 UPGRADE CONTROLS ON COMPRESSORS $3,488 $0 Implemented
GT0739 # 08 Y:2002 08 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $658 $500 Implemented
GT0271 # 06 Y:1985 06 1985 USE DEMAND CONTROLLER OR LOAD SHEDDER $13,200 $5,000 Implemented
GT0271 # 05 Y:1985 05 1985 INSTALL / REPAIR INSULATION ON STEAM LINES $16,058 $1,898 Implemented
GT0271 # 04 Y:1985 04 1985 IMPROVE LUBRICATION PRACTICES $20,435 $0 Implemented
GT0271 # 03 Y:1985 03 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,149 $2,978 Implemented
GT0271 # 02 Y:1985 02 1985 USE COMPUTER PROGRAMS TO OPTIMIZE HVAC PERFORMANCE $27,600 $35,000 Implemented
GT0271 # 01 Y:1985 01 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,850 $830 Implemented
GT0252 # 07 Y:1985 07 1985 RECOVER WASTE HEAT FROM EQUIPMENT $12,650 $10,000 Not Implemented
GT0252 # 06 Y:1985 06 1985 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,490 $0 Implemented
GT0252 # 05 Y:1985 05 1985 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,220 $4,800 Implemented
GT0252 # 04 Y:1985 04 1985 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,283 $2,928 Implemented
GT0252 # 03 Y:1985 03 1985 KEEP BOILER TUBES CLEAN $3,730 $5,000 Implemented