IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

902

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0329 # 01 Y:1998 01 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,000 $500 Implemented
AM0329 # 02 Y:1998 02 1998 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $1,175 $300 Not Implemented
AM0329 # 03 Y:1998 03 1998 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $750 $420 Implemented
AM0329 # 04 Y:1998 04 1998 USE SYNTHETIC LUBRICANT $515 $0 Not Implemented
AM0329 # 05 Y:1998 05 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $445 $0 Implemented
AM0329 # 06 Y:1998 06 1998 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $393 $392 Implemented
AM0329 # 07 Y:1998 07 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $375 $190 Implemented
AM0329 # 08 Y:1998 08 1998 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $360 $740 Implemented
AM0329 # 09 Y:1998 09 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $90 $600 Implemented
MA0412 # 01 Y:1998 01 1998 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $25,681 $7,454 Implemented
MA0412 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,189 $9,625 Not Implemented
MA0412 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,088 $323 Implemented
MA0412 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,686 $3,400 Implemented
MA0412 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $403 Implemented
MA0412 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $65,920 $385,000 Not Implemented
MA0412 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,050 $7,800 Not Implemented
MA0407 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,744 $16,729 Not Implemented
MA0407 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,468 $100 Implemented
MA0407 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $52 Implemented
AS0204 # 01 Y:1997 01 1997 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $63,320 $2,400 Not Implemented
AS0204 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,248 $16,974 Not Implemented
AS0204 # 03 Y:1997 03 1997 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $6,113 $8,000 Not Implemented
AS0204 # 04 Y:1997 04 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,786 $60 Not Implemented
AS0204 # 05 Y:1997 05 1997 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,579 $0 Not Implemented
AS0204 # 06 Y:1997 06 1997 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,288 $3,115 Not Implemented