IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

902

matching recommendations
Reset
SIC 229 Miscellaneous Textile Goods
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0499 # 01 Y:1993 01 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $40,654 $49 Implemented
TN0499 # 02 Y:1993 02 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $26,982 $0 Implemented
TN0499 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,068 $500 Implemented
TN0499 # 04 Y:1993 04 1993 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS $14,164 $0 Not Implemented
TN0499 # 05 Y:1993 05 1993 INSULATE BARE EQUIPMENT $9,913 $30 Not Implemented
TN0499 # 06 Y:1993 06 1993 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $2,725 $350 Not Implemented
TN0499 # 07 Y:1993 07 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,740 $0 Not Implemented
TN0499 # 08 Y:1993 08 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,297 $380 Not Implemented
TN0499 # 09 Y:1993 09 1993 INSULATE BARE EQUIPMENT $443 $170 Implemented
OK0397 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,633 $3,692 Implemented
OK0397 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,271 $2,404 Implemented
OK0397 # 03 Y:1993 03 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $16,531 $11,150 Implemented
OK0397 # 04 Y:1993 04 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,448 $3,185 Implemented
OK0397 # 05 Y:1993 05 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $502 $768 Not Implemented
OK0397 # 06 Y:1993 06 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $558 $0 Not Implemented
RU0155 # 01 Y:1992 01 1992 IMPROVE LUBRICATION PRACTICES $1,320 $800 Not Implemented
RU0155 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $705 $3,250 Not Implemented
RU0155 # 03 Y:1992 03 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $11,077 $5,000 Not Implemented
RU0155 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $598 $42 Not Implemented
RU0155 # 05 Y:1992 05 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $932 $150 Not Implemented
MA0249 # 01 Y:1992 01 1992 BURN A LESS EXPENSIVE GRADE OF FUEL $20,512 $0 Not Implemented
MA0249 # 02 Y:1992 02 1992 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN $10,171 $100 Implemented
MA0249 # 03 Y:1992 03 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $4,808 $6,580 Implemented
MA0249 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,251 $5,020 Not Implemented
MA0249 # 05 Y:1992 05 1992 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $1,845 $600 Implemented