Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
27
matching recommendationsSIC | 229 | Miscellaneous Textile Goods |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0326 # 08 Y:1995 | 08 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $653 | $836 | Implemented |
MA0326 # 07 Y:1995 | 07 | 1995 | INSTALL OCCUPANCY SENSORS | $946 | $986 | Not Implemented |
MA0326 # 01 Y:1995 | 01 | 1995 | SHIFT FROM DAYTIME TO NIGHTTIME OPERATION | $26,014 | $2,700 | Not Implemented |
MA0326 # 02 Y:1995 | 02 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $9,865 | $288 | Not Implemented |
MA0326 # 03 Y:1995 | 03 | 1995 | INSULATE BARE EQUIPMENT | $4,443 | $7,770 | Implemented |
MA0326 # 04 Y:1995 | 04 | 1995 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $2,604 | $4,305 | Implemented |
MA0326 # 05 Y:1995 | 05 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,293 | $2,500 | Implemented |
MA0326 # 06 Y:1995 | 06 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,920 | $0 | Not Implemented |
MA0296 # 08 Y:1994 | 08 | 1994 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $514 | $644 | Implemented |
MA0296 # 07 Y:1994 | 07 | 1994 | INSULATE BARE EQUIPMENT | $881 | $121 | Not Implemented |
MA0296 # 06 Y:1994 | 06 | 1994 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,786 | $1,786 | Not Implemented |
MA0296 # 05 Y:1994 | 05 | 1994 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,714 | $0 | Implemented |
MA0296 # 04 Y:1994 | 04 | 1994 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $3,525 | $7,280 | Not Implemented |
MA0296 # 03 Y:1994 | 03 | 1994 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $6,909 | $20,205 | Not Implemented |
MA0296 # 02 Y:1994 | 02 | 1994 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $11,136 | $10,870 | Not Implemented |
MA0296 # 01 Y:1994 | 01 | 1994 | RECOVER WASTE HEAT FROM EQUIPMENT | $48,128 | $7,677 | Not Implemented |
MA0296 # 09 Y:1994 | 09 | 1994 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $303 | $688 | Not Implemented |
MA0249 # 09 Y:1992 | 09 | 1992 | IMPROVE LUBRICATION PRACTICES | $750 | $0 | Not Implemented |
MA0249 # 08 Y:1992 | 08 | 1992 | USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING | $742 | $1,668 | Implemented |
MA0249 # 07 Y:1992 | 07 | 1992 | REPAIR AND ELIMINATE STEAM LEAKS | $1,312 | $300 | Implemented |
MA0249 # 06 Y:1992 | 06 | 1992 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,480 | $2,854 | Implemented |
MA0249 # 05 Y:1992 | 05 | 1992 | INSTALL / REPAIR INSULATION ON CONDENSATE LINES | $1,845 | $600 | Implemented |
MA0249 # 04 Y:1992 | 04 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,251 | $5,020 | Not Implemented |
MA0249 # 03 Y:1992 | 03 | 1992 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,808 | $6,580 | Implemented |
MA0249 # 02 Y:1992 | 02 | 1992 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $10,171 | $100 | Implemented |