IAC logo
IAC Assessment: MA0249
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: MA0249
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Massachusetts
Assessment Year 1992
Principal Product VINYL SHEETING AND FILM
NAICS n/a
SIC 2295 - Coated Fabrics, Not Rubberized
Sales $10,000,000-$50,000,000
# of Employees 116
Plant Area (Sq.Ft.) 0
Annual Production 21,000 Thousand Feet
Production Hrs. Annual 5,760
Location (State) CT
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $577,279 6,085,580 kWh $0.09
Natural Gas $116,960 35,302 MMBtu $3.31
Fuel Oil #6 $44,541 16,624 MMBtu $2.68
TOTAL ENERGY COSTS $738,780
RECOMMENDED SAVINGS* $44,383 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $20,358
#|Description Savings
Cost
Status Electricity Usage Natural Gas LPG Fuel Oil #6 Electricity Usage Natural Gas LPG Fuel Oil #6
$ kWh $ MMBtu $ MMBtu $ MMBtu
01: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$20,512
Cost:
-
- - $34,170 5,003 $(-13,658) (-5,003) - - -
-
kWh
$34,170
5,003
MMBtu
$(-13,658)
(-5,003)
MMBtu
-
-
MMBtu
02: 2.7316 CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN Savings:
$10,171
Cost:
$100
$10,171 107,268 - - - - - - $10,171
107,268
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$4,808
Cost:
$6,580
$4,808 50,703 - - - - - - $4,808
50,703
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
04: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$2,251
Cost:
$5,020
$2,251 23,740 - - - - - - $2,251
23,740
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
05: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$1,845
Cost:
$600
- - $1,263 462 - - $582 217 -
-
kWh
$1,263
462
MMBtu
-
-
MMBtu
$582
217
MMBtu
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$1,480
Cost:
$2,854
- - $1,014 371 - - $466 174 -
-
kWh
$1,014
371
MMBtu
-
-
MMBtu
$466
174
MMBtu
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$1,312
Cost:
$300
- - $950 287 - - $362 135 -
-
kWh
$950
287
MMBtu
-
-
MMBtu
$362
135
MMBtu
08: 2.1393 USE STEAM SPARGING OR INJECTIONS IN PLACE OF INDIRECT HEATING Savings:
$742
Cost:
$1,668
- - $536 162 - - $206 77 -
-
kWh
$536
162
MMBtu
-
-
MMBtu
$206
77
MMBtu
09: 2.4312 IMPROVE LUBRICATION PRACTICES Savings:
$750
Cost:
-
$750 7,913 - - - - - - $750
7,913
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
10: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$512
Cost:
$77
$512 5,275 - - - - - - $512
5,275
kWh
-
-
MMBtu
-
-
MMBtu
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$44,383
Cost:
$17,199
$18,492 194,899 $37,933 6,285 $(-13,658) (-5,003) $1,616 603 $18,492
194,899
kWh
$37,933
6,285
MMBtu
$(-13,658)
(-5,003)
MMBtu
$1,616
603
MMBtu
TOTAL IMPLEMENTED Savings:
$20,358
Cost:
$12,102
$14,979 157,971 $3,763 1,282 - - $1,616 603 $14,979
157,971
kWh
$3,763
1,282
MMBtu
-
-
MMBtu
$1,616
603
MMBtu
Savings
Cost
$ kWh $ MMBtu $ MMBtu $ MMBtu
Electricity Usage Natural Gas LPG Fuel Oil #6 Electricity Usage Natural Gas LPG Fuel Oil #6