IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

355

matching recommendations
Reset
SIC 2299 Textile Goods, Nec
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0412 # 02 Y:1998 02 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,189 $9,625 Not Implemented
MA0412 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,088 $323 Implemented
MA0412 # 04 Y:1998 04 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,686 $3,400 Implemented
MA0412 # 05 Y:1998 05 1998 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $925 $403 Implemented
MA0412 # 06 Y:1998 06 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $65,920 $385,000 Not Implemented
MA0412 # 07 Y:1998 07 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,050 $7,800 Not Implemented
MA0407 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,744 $16,729 Not Implemented
MA0407 # 02 Y:1998 02 1998 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,468 $100 Implemented
MA0407 # 03 Y:1998 03 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $145 $52 Implemented
OR0293 # 01 Y:1997 01 1997 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $361 $500 Implemented
OR0293 # 02 Y:1997 02 1997 OPTIMIZE PLANT POWER FACTOR $772 $2,600 Not Implemented
OR0293 # 03 Y:1997 03 1997 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,210 $4,665 Implemented
OR0293 # 04 Y:1997 04 1997 USE MAGNETIC TECHNOLOGY TO TREAT WATER $149,760 $238,000 Implemented
OR0293 # 05 Y:1997 05 1997 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE $1,000 $0 Implemented
OR0293 # 06 Y:1997 06 1997 INSTALL AUTOMATIC PACKING EQUIPMENT $48,900 $70,000 Implemented
ME0214 # 01 Y:1997 01 1997 EMPLOY MODULAR JIGS TO REDUCE PROCESS SET-UP TIME $24,500 $7,500 Implemented
ME0214 # 02 Y:1997 02 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,079 $31,719 Implemented
ME0214 # 03 Y:1997 03 1997 PURCHASE APPROPRIATELY SIZED MATERIAL $4,000 $2,840 Implemented
ME0214 # 04 Y:1997 04 1997 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $2,400 $800 Not Implemented
ME0214 # 05 Y:1997 05 1997 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,351 $0 Implemented
ME0214 # 06 Y:1997 06 1997 USE OPTIMUM THICKNESS INSULATION $816 $75 Implemented
ME0214 # 07 Y:1997 07 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $604 $0 Not Implemented
ME0214 # 08 Y:1997 08 1997 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $387 $30 Implemented
ME0214 # 09 Y:1997 09 1997 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $832 $6,200 Implemented
ME0214 # 10 Y:1997 10 1997 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS $3,432 $6,200 Not Implemented