Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,400

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0246 # 03 Y:2024 03 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,628 $3,000 Implemented
UU0246 # 02 Y:2024 02 2024 OPTIMIZE PLANT POWER FACTOR $3,514 $9,000 Implemented
UU0246 # 01 Y:2024 01 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $439 $900 Not Implemented
UU0246 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $8,970 $42,406 Implemented
UU0246 # 05 Y:2024 05 2024 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,731 $338 Implemented
UU0246 # 07 Y:2024 07 2024 USE AUTOMATIC FLOW CONTROL $4,727 $4,633 Not Implemented
UU0246 # 04 Y:2024 04 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $520 $123 Implemented
CC0017 # 01 Y:2023 01 2023 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $90,004 $0 n/a
CC0017 # 05 Y:2023 05 2023 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,525 $0 n/a
CC0017 # 04 Y:2023 04 2023 INSTALL OCCUPANCY SENSORS $4,836 $6,196 n/a
CC0017 # 06 Y:2023 06 2023 USE SOLAR HEAT TO MAKE ELECTRICTY $139,613 $1,192,963 n/a
CC0017 # 02 Y:2023 02 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,997 $8,484 n/a
CC0017 # 03 Y:2023 03 2023 TURN OFF EQUIPMENT WHEN NOT IN USE $6,445 $0 n/a
LE0541 # 02 Y:2023 02 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,461 $100 Implemented
LE0541 # 05 Y:2023 05 2023 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,345 $4,836 Not Implemented
LE0541 # 06 Y:2023 06 2023 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,586 $8,304 Not Implemented
LE0541 # 04 Y:2023 04 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $890 $2,400 Implemented
LE0541 # 03 Y:2023 03 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,846 $4,210 Implemented
LE0541 # 01 Y:2023 01 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $856 $0 Not Implemented
UU0211 # 01 Y:2023 01 2023 REPLACE BOILER $24,600 $111,300 Implemented
UU0211 # 06 Y:2023 06 2023 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $433 $3,100 Not Implemented
UU0211 # 04 Y:2023 04 2023 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,351 $26,250 Implemented
UU0211 # 02 Y:2023 02 2023 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $22,030 $18,300 Not Implemented
UU0211 # 05 Y:2023 05 2023 OPTIMIZE PLANT POWER FACTOR $2,330 $6,230 Not Implemented
UU0211 # 03 Y:2023 03 2023 DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS $7,263 $12,600 Not Implemented