Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,400
matching recommendationsSIC | 23 | Apparel And Other Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0246 # 03 Y:2024 | 03 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,628 | $3,000 | Implemented |
UU0246 # 02 Y:2024 | 02 | 2024 | OPTIMIZE PLANT POWER FACTOR | $3,514 | $9,000 | Implemented |
UU0246 # 01 Y:2024 | 01 | 2024 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $439 | $900 | Not Implemented |
UU0246 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $8,970 | $42,406 | Implemented |
UU0246 # 05 Y:2024 | 05 | 2024 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $1,731 | $338 | Implemented |
UU0246 # 07 Y:2024 | 07 | 2024 | USE AUTOMATIC FLOW CONTROL | $4,727 | $4,633 | Not Implemented |
UU0246 # 04 Y:2024 | 04 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $520 | $123 | Implemented |
CC0017 # 01 Y:2023 | 01 | 2023 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $90,004 | $0 | n/a |
CC0017 # 05 Y:2023 | 05 | 2023 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,525 | $0 | n/a |
CC0017 # 04 Y:2023 | 04 | 2023 | INSTALL OCCUPANCY SENSORS | $4,836 | $6,196 | n/a |
CC0017 # 06 Y:2023 | 06 | 2023 | USE SOLAR HEAT TO MAKE ELECTRICTY | $139,613 | $1,192,963 | n/a |
CC0017 # 02 Y:2023 | 02 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,997 | $8,484 | n/a |
CC0017 # 03 Y:2023 | 03 | 2023 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,445 | $0 | n/a |
LE0541 # 02 Y:2023 | 02 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,461 | $100 | Implemented |
LE0541 # 05 Y:2023 | 05 | 2023 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,345 | $4,836 | Not Implemented |
LE0541 # 06 Y:2023 | 06 | 2023 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $1,586 | $8,304 | Not Implemented |
LE0541 # 04 Y:2023 | 04 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $890 | $2,400 | Implemented |
LE0541 # 03 Y:2023 | 03 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,846 | $4,210 | Implemented |
LE0541 # 01 Y:2023 | 01 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $856 | $0 | Not Implemented |
UU0211 # 01 Y:2023 | 01 | 2023 | REPLACE BOILER | $24,600 | $111,300 | Implemented |
UU0211 # 06 Y:2023 | 06 | 2023 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $433 | $3,100 | Not Implemented |
UU0211 # 04 Y:2023 | 04 | 2023 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $3,351 | $26,250 | Implemented |
UU0211 # 02 Y:2023 | 02 | 2023 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $22,030 | $18,300 | Not Implemented |
UU0211 # 05 Y:2023 | 05 | 2023 | OPTIMIZE PLANT POWER FACTOR | $2,330 | $6,230 | Not Implemented |
UU0211 # 03 Y:2023 | 03 | 2023 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $7,263 | $12,600 | Not Implemented |