Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,437
matching recommendationsSIC | 23 | Apparel And Other Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UL2509 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,434 | $735 | n/a |
UL2509 # 06 Y:2025 | 06 | 2025 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $25,358 | $30,000 | n/a |
UL2509 # 02 Y:2025 | 02 | 2025 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $391 | $0 | n/a |
UL2509 # 03 Y:2025 | 03 | 2025 | INSTALL OCCUPANCY SENSORS | $1,146 | $4,527 | n/a |
UL2509 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $169,510 | $2,499,627 | n/a |
UL2509 # 05 Y:2025 | 05 | 2025 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $35,838 | $43,234 | n/a |
UU0270 # 01 Y:2025 | 01 | 2025 | APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES | $8,350 | $15,900 | n/a |
UU0270 # 03 Y:2025 | 03 | 2025 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,825 | $17,730 | n/a |
UU0270 # 05 Y:2025 | 05 | 2025 | PAY UTILITY BILLS ON TIME | $700 | $1,650 | n/a |
UU0270 # 06 Y:2025 | 06 | 2025 | PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER | $17,175 | $12,320 | n/a |
UU0270 # 02 Y:2025 | 02 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $12,940 | $105,710 | n/a |
UU0270 # 04 Y:2025 | 04 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $645 | $820 | n/a |
UL2503 # 04 Y:2025 | 04 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $53,722 | $482,406 | n/a |
UL2503 # 01 Y:2025 | 01 | 2025 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,701 | $2,100 | n/a |
UL2503 # 03 Y:2025 | 03 | 2025 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $17,129 | $32,120 | n/a |
UL2503 # 05 Y:2025 | 05 | 2025 | RECOVER WASTE HEAT FROM EQUIPMENT | $2,094 | $7,500 | n/a |
UL2503 # 02 Y:2025 | 02 | 2025 | OPTIMIZE PLANT POWER FACTOR | $6,739 | $14,223 | n/a |
UF0628 # 08 Y:2025 | 08 | 2025 | UPGRADE CONTROLS ON COMPRESSORS | $2,783 | $6,000 | n/a |
UF0628 # 07 Y:2025 | 07 | 2025 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $3,937 | $18,930 | n/a |
UF0628 # 09 Y:2025 | 09 | 2025 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,115 | $1,235 | n/a |
UF0628 # 03 Y:2025 | 03 | 2025 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $12,464 | $25,640 | n/a |
UF0628 # 01 Y:2025 | 01 | 2025 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,801 | $322,608 | n/a |
UF0628 # 06 Y:2025 | 06 | 2025 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $3,938 | $0 | n/a |
UF0628 # 05 Y:2025 | 05 | 2025 | UPGRADE OBSOLETE EQUIPMENT | $4,580 | $16,608 | n/a |
UF0628 # 02 Y:2025 | 02 | 2025 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $43,459 | $43,906 | n/a |