IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,394

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0341 # 05 Y:2009 05 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,400 $196 Implemented
DL0033 # 01 Y:2009 01 2009 USE MINIMUM STEAM OPERATING PRESSURE $1,091 $0 Implemented
DL0033 # 02 Y:2009 02 2009 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM $5,409 $9,300 Implemented
DL0033 # 03 Y:2009 03 2009 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,789 $16,100 Implemented
DL0033 # 04 Y:2009 04 2009 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,737 $10,000 Implemented
DL0033 # 05 Y:2009 05 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $80 Implemented
DL0033 # 06 Y:2009 06 2009 UPGRADE CONTROLS ON COMPRESSORS $3,596 $12,500 Not Implemented
DL0033 # 07 Y:2009 07 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $310 $150 Implemented
DL0033 # 08 Y:2009 08 2009 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $6,433 $26,980 Implemented
WV0387 # 01 Y:2009 01 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $43,474 $56,368 Implemented
WV0387 # 02 Y:2009 02 2009 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $7,123 $12,560 Not Implemented
WV0387 # 03 Y:2009 03 2009 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,978 $0 Implemented
WV0387 # 04 Y:2009 04 2009 RECOVER WASTE HEAT FROM EQUIPMENT $4,801 $1,480 Not Implemented
WV0387 # 05 Y:2009 05 2009 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $4,208 $47 Not Implemented
WV0387 # 06 Y:2009 06 2009 OPTIMIZE PLANT POWER FACTOR $3,260 $4,450 Not Implemented
WV0387 # 07 Y:2009 07 2009 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,818 $148 Implemented
WV0387 # 08 Y:2009 08 2009 DEVELOP A REPAIR/REPLACE POLICY $2,515 $651 Implemented
WV0387 # 09 Y:2009 09 2009 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $2,292 $3,840 Not Implemented
WV0387 # 10 Y:2009 10 2009 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,892 $0 Implemented
WV0387 # 11 Y:2009 11 2009 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,753 $460 Not Implemented
WV0387 # 12 Y:2009 12 2009 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,520 $28 Implemented
UM0342 # 01 Y:2008 01 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $9,661 $7,350 Not Implemented
UM0342 # 02 Y:2008 02 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,313 $7,500 Implemented
UM0342 # 03 Y:2008 03 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,736 $13,776 Not Implemented
UM0342 # 04 Y:2008 04 2008 REDUCE VENTILATION AIR $2,824 $1,228 Not Implemented