IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,394

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MS0180 # 04 Y:2001 04 2001 INSULATE BARE EQUIPMENT $162 $83 Implemented
MS0180 # 05 Y:2001 05 2001 INSTALL / REPAIR INSULATION ON STEAM LINES $70 $88 Implemented
MS0180 # 06 Y:2001 06 2001 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $2,093 $1,573 Not Implemented
MS0180 # 07 Y:2001 07 2001 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $63 $48 Implemented
MA0476 # 01 Y:2000 01 2000 RECOVER WASTE HEAT FROM EQUIPMENT $109,000 $720,000 Not Implemented
MA0476 # 02 Y:2000 02 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,750 $50,000 Not Implemented
MA0476 # 03 Y:2000 03 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,100 $24,000 Implemented
MA0476 # 04 Y:2000 04 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $13,130 $1,000 Implemented
MA0476 # 05 Y:2000 05 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,020 $35,000 Not Implemented
MA0476 # 06 Y:2000 06 2000 RECOVER WASTE HEAT FROM EQUIPMENT $6,840 $40,000 Not Implemented
MA0476 # 07 Y:2000 07 2000 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,150 $5,000 Implemented
MA0476 # 08 Y:2000 08 2000 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,760 $7,500 Implemented
MA0476 # 09 Y:2000 09 2000 TURN OFF EQUIPMENT WHEN NOT IN USE $3,790 $0 Implemented
MA0476 # 10 Y:2000 10 2000 ISOLATE HOT OR COLD EQUIPMENT $2,280 $0 Implemented
MA0476 # 11 Y:2000 11 2000 REPAIR AND ELIMINATE STEAM LEAKS $950 $500 Implemented
DS0173 # 01 Y:2000 01 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,510 $3,702 Implemented
DS0173 # 02 Y:2000 02 2000 OPTIMIZE PLANT POWER FACTOR $588 $700 Implemented
DS0173 # 03 Y:2000 03 2000 INSTALL TIMERS AND/OR THERMOSTATS $1,399 $1,595 Implemented
DS0173 # 04 Y:2000 04 2000 DISCONNECT BALLASTS $734 $160 Implemented
DS0173 # 05 Y:2000 05 2000 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $5,574 $8,370 Not Implemented
DS0173 # 06 Y:2000 06 2000 SELL COMBUSTIBLE WASTE $2,721 $8,050 Not Implemented
DS0173 # 07 Y:2000 07 2000 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $5,520 $0 Not Implemented
NC0195 # 01 Y:2000 01 2000 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $150,957 $214,000 Implemented
NC0195 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,306 $300 Implemented
NC0195 # 03 Y:2000 03 2000 DISCONNECT BALLASTS $7,600 $6,350 Implemented