IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

223

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MO0145 # 02 Y:1995 02 1995 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $17,794 $824 Not Implemented
MO0145 # 03 Y:1995 03 1995 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $1,410 $40 Implemented
MO0145 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,037 $7,975 Implemented
MO0145 # 05 Y:1995 05 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,293 $1,629 Not Implemented
MO0145 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $98 $165 Not Implemented
MO0145 # 07 Y:1995 07 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,593 $640 Implemented
MO0145 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,282 $938 Implemented
MO0145 # 09 Y:1995 09 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $607 $40 Implemented
MO0145 # 10 Y:1995 10 1995 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $413 $0 Implemented
MO0145 # 11 Y:1995 11 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,902 $14,404 Implemented
MO0145 # 12 Y:1995 12 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $311 $1,265 Implemented
MO0145 # 13 Y:1995 13 1995 REPAIR AND ELIMINATE STEAM LEAKS $838 $100 Implemented
MO0140 # 01 Y:1995 01 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,303 $37,944 Not Implemented
MO0140 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,214 $1,488 Implemented
MO0140 # 03 Y:1995 03 1995 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $3,337 $200 Implemented
MO0140 # 04 Y:1995 04 1995 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $408 $150 Not Implemented
MO0140 # 05 Y:1995 05 1995 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $521 $4,594 Implemented
MO0140 # 06 Y:1995 06 1995 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $269 $925 Implemented
MO0140 # 07 Y:1995 07 1995 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $248 $25 Not Implemented
MO0140 # 08 Y:1995 08 1995 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $284 $171 Implemented
MO0140 # 09 Y:1995 09 1995 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $296 $686 Implemented
MO0128 # 01 Y:1994 01 1994 COVER OPEN TANKS $68,575 $17,810 Implemented
MO0128 # 02 Y:1994 02 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $27,900 $525 Implemented
MO0128 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $474 $995 Implemented
MO0128 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,290 $37,862 Implemented