IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,408

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0450 # 02 Y:1994 02 1994 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,150 $6,790 Not Implemented
OK0450 # 03 Y:1994 03 1994 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,624 $4,901 Not Implemented
OK0450 # 04 Y:1994 04 1994 ADD AREA LIGHTING SWITCHES $861 $1,272 Implemented
OK0450 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $513 $997 Implemented
OK0450 # 06 Y:1994 06 1994 RECOVER WASTE HEAT FROM EQUIPMENT $419 $544 Implemented
OK0450 # 07 Y:1994 07 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $298 $655 Implemented
GT0537 # 01 Y:1994 01 1994 USE OPTIMUM THICKNESS INSULATION $5,290 $3,420 Not Implemented
GT0537 # 02 Y:1994 02 1994 USE DIRECT AIR SUPPLY TO EXHAUST HOODS $534 $2,465 Not Implemented
GT0537 # 03 Y:1994 03 1994 RECOVER WASTE HEAT FROM EQUIPMENT $780 $1,800 Not Implemented
GT0537 # 04 Y:1994 04 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,910 $19,620 Not Implemented
MO0128 # 01 Y:1994 01 1994 COVER OPEN TANKS $68,575 $17,810 Implemented
MO0128 # 02 Y:1994 02 1994 INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) $27,900 $525 Implemented
MO0128 # 03 Y:1994 03 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $474 $995 Implemented
MO0128 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $19,290 $37,862 Implemented
MO0128 # 05 Y:1994 05 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,144 $820 Implemented
MO0128 # 06 Y:1994 06 1994 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,303 $670 Not Implemented
MO0128 # 07 Y:1994 07 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,267 $50 Not Implemented
MO0128 # 08 Y:1994 08 1994 USE SYNTHETIC LUBRICANT $844 $416 Not Implemented
MO0128 # 09 Y:1994 09 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,539 $5,392 Implemented
MO0128 # 10 Y:1994 10 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $808 $297 Implemented
NC0034 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,966 $720 Implemented
NC0034 # 02 Y:1994 02 1994 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $1,677 $210 Implemented
NC0034 # 03 Y:1994 03 1994 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,152 $20 Implemented
NC0034 # 04 Y:1994 04 1994 RECOVER WASTE HEAT FROM EQUIPMENT $897 $2,500 Implemented
NC0034 # 05 Y:1994 05 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,256 $1,746 Not Implemented