IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,390

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
DL0167 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,895 $16,550 Implemented
DL0167 # 03 Y:2016 03 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,405 $3,610 Not Implemented
DL0167 # 04 Y:2016 04 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,603 $5,470 Implemented
DL0167 # 05 Y:2016 05 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,000 $13,010 Implemented
DL0167 # 06 Y:2016 06 2016 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $8,529 $21,200 Not Implemented
DL0167 # 07 Y:2016 07 2016 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $33,048 $85,000 Implemented
DL0167 # 08 Y:2016 08 2016 RECOVER WASTE HEAT FROM EQUIPMENT $40,226 $107,360 Not Implemented
DL0167 # 09 Y:2016 09 2016 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $8,556 $36,400 Not Implemented
DL0167 # 10 Y:2016 10 2016 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $816 $4,560 Implemented
IP0069 # 01 Y:2016 01 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $490 $0 Implemented
IP0069 # 02 Y:2016 02 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,282 $21 Implemented
IP0069 # 03 Y:2016 03 2016 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $5,637 $3 Not Implemented
IP0069 # 04 Y:2016 04 2016 INSTALL OCCUPANCY SENSORS $9,327 $377 Implemented
IP0069 # 05 Y:2016 05 2016 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $50 $5 Not Implemented
IP0069 # 06 Y:2016 06 2016 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $2,989 $215 Implemented
IP0069 # 07 Y:2016 07 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $27,384 $7,218 Implemented
IP0069 # 08 Y:2016 08 2016 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $22,750 $12,163 Not Implemented
IP0069 # 09 Y:2016 09 2016 RECOVER WASTE HEAT FROM EQUIPMENT $1,712 $1,271 Not Implemented
IP0069 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,756 $4,316 Implemented
IP0069 # 11 Y:2016 11 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $231 $351 Implemented
IP0069 # 12 Y:2016 12 2016 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $15,955 $38,395 Not Implemented
UK1510 # 01 Y:2015 01 2015 UPGRADE CONTROLS ON COMPRESSORS $10,047 $6,250 Not Implemented
UK1510 # 02 Y:2015 02 2015 USE PHOTOCELL CONTROLS $3,354 $750 Implemented
UK1510 # 03 Y:2015 03 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,580 $2,360 Implemented
UK1510 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,187 $2,890 Implemented