IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

91

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KU0404 # 04 Y:1993 04 1993 USE OPTIMUM THICKNESS INSULATION $5,818 $3,721 Not Implemented
KU0404 # 08 Y:1993 08 1993 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $186 $0 Implemented
KU0404 # 06 Y:1993 06 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $625 $780 Implemented
KU0404 # 05 Y:1993 05 1993 TURN OFF EQUIPMENT WHEN NOT IN USE $1,106 $1,350 Implemented
KU0404 # 07 Y:1993 07 1993 RECOVER WASTE HEAT FROM EQUIPMENT $518 $678 Implemented
KU0404 # 01 Y:1993 01 1993 CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS $10,634 $11,960 Implemented
KU0404 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,539 $8,930 Implemented
KU0404 # 03 Y:1993 03 1993 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $663 $0 Implemented
KU0391 # 03 Y:1993 03 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,070 $1,281 Not Implemented
KU0391 # 09 Y:1993 09 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $100 $88 Implemented
KU0391 # 08 Y:1993 08 1993 REPAIR AND ELIMINATE STEAM LEAKS $292 $70 Implemented
KU0391 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $128 $350 Not Implemented
KU0391 # 06 Y:1993 06 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $46 $0 Implemented
KU0391 # 05 Y:1993 05 1993 INSTALL OCCUPANCY SENSORS $1,181 $1,200 Not Implemented
KU0391 # 04 Y:1993 04 1993 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,732 $1,316 Not Implemented
KU0391 # 02 Y:1993 02 1993 INSTALL TIMERS AND/OR THERMOSTATS $3,692 $4,410 Implemented
OK0310 # 03 Y:1990 03 1990 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $2,917 $776 Implemented
OK0310 # 02 Y:1990 02 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $920 $242 Not Implemented
OK0310 # 01 Y:1990 01 1990 INSTALL TIMERS AND/OR THERMOSTATS $2,570 $1,500 Implemented
OK0310 # 05 Y:1990 05 1990 INSTALL / REPAIR INSULATION ON STEAM LINES $96 $280 Implemented
OK0310 # 04 Y:1990 04 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $510 $850 Implemented
KU0159 # 02 Y:1985 02 1985 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,530 $20,000 Implemented
KU0159 # 01 Y:1985 01 1985 INSULATE BARE EQUIPMENT $1,719 $500 Implemented
KU0159 # 03 Y:1985 03 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $799 $1,500 Implemented
KU0159 # 04 Y:1985 04 1985 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,842 $2,505 Implemented