Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
67
matching recommendationsSIC | 23 | Apparel And Other Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0668 # 09 Y:2003 | 09 | 2003 | SWITCH TO A SOLVENT THAT CAN BE CLEANED AND RE-USED | $2,248 | $7,000 | Not Implemented |
UD0668 # 04 Y:2003 | 04 | 2003 | ADD AREA LIGHTING SWITCHES | $11,320 | $7,350 | Not Implemented |
UD0668 # 03 Y:2003 | 03 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,018 | $37,750 | Not Implemented |
UD0668 # 02 Y:2003 | 02 | 2003 | IMPROVE SPACE COMFORT CONDITIONING | $40,000 | $44,000 | Not Implemented |
UD0668 # 01 Y:2003 | 01 | 2003 | CHECK FOR ACCURACY OF UTILITY / POWER METERS | $48,976 | $0 | Not Implemented |
UD0668 # 17 Y:2003 | 17 | 2003 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $227 | $45 | Not Implemented |
UD0668 # 15 Y:2003 | 15 | 2003 | DISCONNECT BALLASTS | $260 | $60 | Not Implemented |
UD0668 # 14 Y:2003 | 14 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,071 | $0 | Not Implemented |
UD0668 # 13 Y:2003 | 13 | 2003 | INSTALL / REPAIR INSULATION ON STEAM LINES | $610 | $642 | Not Implemented |
UD0668 # 16 Y:2003 | 16 | 2003 | COVER OPEN TANKS | $253 | $200 | Not Implemented |
UD0668 # 10 Y:2003 | 10 | 2003 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,723 | $2,000 | Not Implemented |
UD0668 # 12 Y:2003 | 12 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $730 | $0 | Not Implemented |
UD0668 # 11 Y:2003 | 11 | 2003 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,224 | $2,747 | Not Implemented |
UD0668 # 05 Y:2003 | 05 | 2003 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $4,612 | $1,000 | Not Implemented |
UD0668 # 06 Y:2003 | 06 | 2003 | TURN OFF EQUIPMENT WHEN NOT IN USE | $3,423 | $200 | Not Implemented |
UD0668 # 08 Y:2003 | 08 | 2003 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $2,834 | $1,382 | Not Implemented |
UD0668 # 07 Y:2003 | 07 | 2003 | CENTRALIZE CONTROL OF EXHAUST FANS TO ENSURE THEIR SHUTDOWN, OR ESTABLISH PROGRAM TO ENSURE MANUAL SHUTDOWN | $3,380 | $0 | Not Implemented |
UD0590 # 03 Y:2000 | 03 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $9,607 | $2,240 | Implemented |
UD0590 # 04 Y:2000 | 04 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,229 | $3,038 | Not Implemented |
UD0590 # 05 Y:2000 | 05 | 2000 | INCREASE AMOUNT OF CONDENSATE RETURNED | $811 | $0 | Implemented |
UD0590 # 02 Y:2000 | 02 | 2000 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $35,359 | $10,000 | Implemented |
UD0590 # 01 Y:2000 | 01 | 2000 | USE COUNTER CURRENT RINSING TO REDUCE WASTE WATER | $47,817 | $3,000 | Not Implemented |
UD0531 # 02 Y:1997 | 02 | 1997 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $611 | $2,000 | Implemented |
UD0531 # 01 Y:1997 | 01 | 1997 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,192 | $300 | Implemented |
UD0531 # 03 Y:1997 | 03 | 1997 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,444 | $12,327 | Implemented |