IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

33

matching recommendations
Reset
SIC 23 Apparel And Other Textile Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0590 # 05 Y:2000 05 2000 INCREASE AMOUNT OF CONDENSATE RETURNED $811 $0 Implemented
UD0590 # 03 Y:2000 03 2000 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,607 $2,240 Implemented
UD0590 # 02 Y:2000 02 2000 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $35,359 $10,000 Implemented
UD0531 # 03 Y:1997 03 1997 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,444 $12,327 Implemented
UD0531 # 02 Y:1997 02 1997 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $611 $2,000 Implemented
UD0531 # 01 Y:1997 01 1997 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,192 $300 Implemented
UD0501 # 01 Y:1996 01 1996 OPTIMIZE PLANT POWER FACTOR $9,536 $8,000 Implemented
UD0476 # 06 Y:1995 06 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,376 $7,760 Implemented
UD0476 # 01 Y:1995 01 1995 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,900 $1,000 Implemented
UD0476 # 02 Y:1995 02 1995 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $3,648 $12,000 Implemented
UD0476 # 03 Y:1995 03 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $10,234 $15,045 Implemented
UD0476 # 08 Y:1995 08 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,903 $3,290 Implemented
UD0476 # 07 Y:1995 07 1995 DISCONNECT BALLASTS $673 $210 Implemented
UD0476 # 04 Y:1995 04 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,633 $10,570 Implemented
UD0476 # 05 Y:1995 05 1995 DISCONNECT BALLASTS $2,576 $1,920 Implemented
UD0366 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,144 $532 Implemented
UD0366 # 03 Y:1992 03 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,078 $0 Implemented
UD0366 # 02 Y:1992 02 1992 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $582 $500 Implemented
UD0366 # 01 Y:1992 01 1992 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $1,200 $0 Implemented
UD0240 # 01 Y:1987 01 1987 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY $6,646 $10,000 Implemented
UD0240 # 02 Y:1987 02 1987 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $289 $400 Implemented
UD0240 # 03 Y:1987 03 1987 INSTALL SET-BACK TIMERS $2,314 $300 Implemented
UD0189 # 02 Y:1986 02 1986 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $952 $0 Implemented
UD0189 # 03 Y:1986 03 1986 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,061 $5,112 Implemented
UD0184 # 02 Y:1985 02 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,473 $10,670 Implemented