IAC logo
IAC Assessment: UD0501
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: UD0501
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Dayton
Assessment Year 1996
Principal Product fabric cutting and embroidery
NAICS n/a
SIC 2326 - Men's and Boys' Work Clothing
Sales $10,000,000-$50,000,000
# of Employees 550
Plant Area (Sq.Ft.) 300,000
Annual Production 10,000,000 Pieces
Production Hrs. Annual 6,100
Location (State) OH
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $272,985 9,672,919 kWh $0.03
Electricity Demand $232,217 20,268 kW-months/year $11.46
Natural Gas $19,842 4,198 MMBtu $4.73
TOTAL ENERGY COSTS $525,044
RECOMMENDED SAVINGS* $52,348 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,536
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal
$ kWh $ kW-months/year $ MMBtu $ Tgal
01: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$9,536
Cost:
$8,000
- - $9,536 678 - - - - -
-
kWh
$9,536
678
kW-months/year
-
-
MMBtu
-
-
Tgal
02: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,342
Cost:
$3,500
- - - - $3,342 711 - - -
-
kWh
-
-
kW-months/year
$3,342
711
MMBtu
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$32,125
Cost:
$66,000
$14,116 672,333 $18,009 1,280 - - - - $14,116
672,333
kWh
$18,009
1,280
kW-months/year
-
-
MMBtu
-
-
Tgal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,333
Cost:
$7,740
$1,278 60,961 $2,055 146 - - - - $1,278
60,961
kWh
$2,055
146
kW-months/year
-
-
MMBtu
-
-
Tgal
05: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$2,186
Cost:
-
$934 44,549 $1,252 89 - - - - $934
44,549
kWh
$1,252
89
kW-months/year
-
-
MMBtu
-
-
Tgal
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$1,826
Cost:
$200
- - - - - - $1,826 560,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,826
560,000
Tgal
TOTAL RECOMMENDED Savings:
$52,348
Cost:
$85,440
$16,328 777,843 $30,852 2,193 $3,342 711 $1,826 560,000 $16,328
777,843
kWh
$30,852
2,193
kW-months/year
$3,342
711
MMBtu
$1,826
560,000
Tgal
TOTAL IMPLEMENTED Savings:
$9,536
Cost:
$8,000
- - $9,536 678 - - - - -
-
kWh
$9,536
678
kW-months/year
-
-
MMBtu
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal
Electricity Usage Electricity Demand Natural Gas Water Disposal Electricity Usage Electricity Demand Natural Gas Water Disposal