IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

772

matching recommendations
Reset
SIC 232 Men's And Boys' Furnishings, Work Clothing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0792 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,543 $3,114 Implemented
OK0792 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $959 $750 Implemented
OK0792 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $469 $275 Implemented
OK0792 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $733 $2,755 Implemented
OK0792 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,607 $8,168 Not Implemented
OK0792 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $644 Implemented
OK0792 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $1,160 $11,630 Not Implemented
OK0792 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $304 $902 Implemented
OK0792 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $156 $143 Not Implemented
OK0792 # 10 Y:2010 10 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,203 $109,200 Not Implemented
OK0792 # 11 Y:2010 11 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,037 $78,057 Not Implemented
NC0381 # 01 Y:2008 01 2008 RECOVER WASTE HEAT FROM EQUIPMENT $80,420 $183,000 Not Implemented
NC0381 # 02 Y:2008 02 2008 REPLACE BOILER $34,528 $60,000 Not Implemented
NC0381 # 03 Y:2008 03 2008 ADJUST BURNERS FOR EFFICIENT OPERATION $1,430 $800 Implemented
NC0381 # 04 Y:2008 04 2008 INSULATE BARE EQUIPMENT $1,224 $1,030 Implemented
NC0381 # 09 Y:2008 09 2008 DEVELOP A REPAIR/REPLACE POLICY $1,192 $1,540 Not Implemented
NC0381 # 08 Y:2008 08 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,562 $1,472 Not Implemented
NC0381 # 05 Y:2008 05 2008 REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY $998 $500 Implemented
NC0381 # 06 Y:2008 06 2008 RECOVER WASTE HEAT FROM EQUIPMENT $6,183 $4,900 Not Implemented
NC0381 # 07 Y:2008 07 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,016 $100 Implemented
NC0264 # 10 Y:2003 10 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $350 Implemented
NC0264 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $100 Not Implemented
NC0264 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $160 $280 Not Implemented
NC0264 # 07 Y:2003 07 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,875 $500 Not Implemented
NC0264 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $152 $627 Implemented