IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

772

matching recommendations
Reset
SIC 232 Men's And Boys' Furnishings, Work Clothing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NC0264 # 06 Y:2003 06 2003 INSULATE BARE EQUIPMENT $152 $627 Implemented
NC0264 # 07 Y:2003 07 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $1,875 $500 Not Implemented
NC0264 # 08 Y:2003 08 2003 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $160 $280 Not Implemented
NC0264 # 09 Y:2003 09 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $264 $100 Not Implemented
NC0264 # 10 Y:2003 10 2003 INSTALL TIMERS AND/OR THERMOSTATS $1,393 $350 Implemented
AS0361 # 01 Y:2003 01 2003 INSTALL / REPAIR INSULATION ON STEAM LINES $168 $350 Implemented
AS0361 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,025 $30 Implemented
AS0361 # 03 Y:2003 03 2003 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,305 $1,400 Not Implemented
AS0361 # 04 Y:2003 04 2003 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $11,899 $17,550 Not Implemented
AS0361 # 05 Y:2003 05 2003 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $2,290 $482 Implemented
AS0361 # 06 Y:2003 06 2003 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $2,846 $1,000 Not Implemented
LL0163 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,982 $2,560 Not Implemented
LL0163 # 02 Y:2003 02 2003 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,665 $690 Not Implemented
LL0163 # 03 Y:2003 03 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $479 $20 Not Implemented
LL0163 # 04 Y:2003 04 2003 INSTALL OCCUPANCY SENSORS $182 $104 Not Implemented
LL0163 # 05 Y:2003 05 2003 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $4,950 $0 Not Implemented
UU0036 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,377 $10,838 Not Implemented
UU0036 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $148 $20 Implemented
UU0036 # 03 Y:2002 03 2002 USE SYNTHETIC LUBRICANT $75 $44 Implemented
UU0036 # 04 Y:2002 04 2002 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,776 $0 Not Implemented
MI0021 # 01 Y:2001 01 2001 METER WASTE WATER $13,904 $3,650 Not Implemented
MI0021 # 02 Y:2001 02 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,770 $312 Implemented
MI0021 # 03 Y:2001 03 2001 MODIFY STARTUP/SHUTDOWN TIMES $3,634 $113 Not Implemented
MI0021 # 04 Y:2001 04 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $2,275 $7 Not Implemented
MI0021 # 05 Y:2001 05 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $3,250 $4,200 Implemented