IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

119

matching recommendations
Reset
SIC 232 Men's And Boys' Furnishings, Work Clothing
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0231 # 03 Y:1984 03 1984 INSTALL SET-BACK TIMERS $1,771 $0 Implemented
TN0231 # 04 Y:1984 04 1984 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $113 $400 Implemented
TN0231 # 05 Y:1984 05 1984 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $922 $0 Implemented
TN0231 # 06 Y:1984 06 1984 INSTALL / REPAIR INSULATION ON STEAM LINES $124 $42 Implemented
TN0231 # 07 Y:1984 07 1984 INSULATE BARE EQUIPMENT $142 $205 Implemented
TN0231 # 08 Y:1984 08 1984 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $398 $0 Not Implemented
TN0142 # 01 Y:1982 01 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $253 $1,850 Not Implemented
TN0142 # 02 Y:1982 02 1982 USE OPTIMUM THICKNESS INSULATION $281 $176 Not Implemented
TN0142 # 03 Y:1982 03 1982 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $472 $500 Not Implemented
TN0125 # 01 Y:1982 01 1982 INSTALL SET-BACK TIMERS $6,284 $0 Not Implemented
TN0125 # 02 Y:1982 02 1982 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $4,900 $0 Not Implemented
TN0125 # 03 Y:1982 03 1982 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,430 $0 Not Implemented
TN0125 # 04 Y:1982 04 1982 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,260 $17,250 Not Implemented
TN0119 # 01 Y:1982 01 1982 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $7,158 $100 Not Implemented
TN0119 # 02 Y:1982 02 1982 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $3,150 $2,500 Not Implemented
TN0119 # 03 Y:1982 03 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $916 $1,300 Not Implemented
TN0109 # 01 Y:1982 01 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $548 $1,710 Not Implemented
TN0109 # 02 Y:1982 02 1982 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $120 $72 Not Implemented
TN0109 # 03 Y:1982 03 1982 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $193 $0 Not Implemented