Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
48
matching recommendationsSIC | 2325 | Men's and Boys' Separate Trousers and Slacks |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KG0068 # 10 Y:1996 | 10 | 1996 | INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE | $12,707 | $5,023 | Implemented |
KG0068 # 01 Y:1996 | 01 | 1996 | USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE | $7,700 | $60 | Implemented |
KG0068 # 02 Y:1996 | 02 | 1996 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $5,738 | $250 | Not Implemented |
KG0068 # 03 Y:1996 | 03 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,180 | $2,767 | Implemented |
KG0068 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,022 | $12,000 | Not Implemented |
KG0068 # 05 Y:1996 | 05 | 1996 | LOWER CEILING TO REDUCE CONDITIONED SPACE | $2,738 | $5,000 | Implemented |
KG0068 # 06 Y:1996 | 06 | 1996 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,578 | $12 | Implemented |
KG0068 # 07 Y:1996 | 07 | 1996 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $771 | $1,800 | Implemented |
KG0068 # 08 Y:1996 | 08 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $758 | $2,490 | Implemented |
KG0068 # 09 Y:1996 | 09 | 1996 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $491 | $920 | Implemented |
KG0066 # 10 Y:1996 | 10 | 1996 | RECOVER AND REUSE WASTE MATERIAL | $3,991 | $2,344 | Not Implemented |
KG0066 # 09 Y:1996 | 09 | 1996 | REDUCE SCRAP PRODUCTION | $76,927 | $0 | Not Implemented |
KG0066 # 08 Y:1996 | 08 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $485 | $353 | Not Implemented |
KG0066 # 07 Y:1996 | 07 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $490 | $300 | Not Implemented |
KG0066 # 06 Y:1996 | 06 | 1996 | INSTALL OCCUPANCY SENSORS | $751 | $130 | Not Implemented |
KG0066 # 05 Y:1996 | 05 | 1996 | AIR CONDITION ONLY SPACE NECESSARY | $2,569 | $1,150 | Not Implemented |
KG0066 # 04 Y:1996 | 04 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,254 | $1,530 | Not Implemented |
KG0066 # 03 Y:1996 | 03 | 1996 | USE SYNTHETIC LUBRICANT | $1,309 | $0 | Not Implemented |
KG0066 # 02 Y:1996 | 02 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,752 | $26,520 | Not Implemented |
KG0066 # 01 Y:1996 | 01 | 1996 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $23,966 | $42,000 | Not Implemented |
AR0094 # 02 Y:1996 | 02 | 1996 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,701 | $1,445 | Not Implemented |
AR0094 # 01 Y:1996 | 01 | 1996 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $602 | $412 | Not Implemented |
AR0094 # 03 Y:1996 | 03 | 1996 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,020 | $1,000 | Not Implemented |
AR0094 # 04 Y:1996 | 04 | 1996 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $521 | $200 | Not Implemented |
AR0094 # 05 Y:1996 | 05 | 1996 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $882 | $1,520 | Not Implemented |