Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

23

matching recommendations
Reset
SIC 2329 Men's and Boys' Clothing, Not Elsewhere Classified
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0792 # 11 Y:2010 11 2010 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,037 $78,057 Not Implemented
OK0792 # 10 Y:2010 10 2010 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $6,203 $109,200 Not Implemented
OK0792 # 09 Y:2010 09 2010 INSULATE BARE EQUIPMENT $156 $143 Not Implemented
OK0792 # 08 Y:2010 08 2010 INSTALL / REPAIR INSULATION ON STEAM LINES $304 $902 Implemented
OK0792 # 07 Y:2010 07 2010 OPTIMIZE PLANT POWER FACTOR $1,160 $11,630 Not Implemented
OK0792 # 06 Y:2010 06 2010 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $741 $644 Implemented
OK0792 # 05 Y:2010 05 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,607 $8,168 Not Implemented
OK0792 # 04 Y:2010 04 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $733 $2,755 Implemented
OK0792 # 03 Y:2010 03 2010 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $469 $275 Implemented
OK0792 # 02 Y:2010 02 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $959 $750 Implemented
OK0792 # 01 Y:2010 01 2010 RECOVER WASTE HEAT FROM EQUIPMENT $2,543 $3,114 Implemented
OK0372 # 04 Y:1992 04 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $4,558 $9,275 Not Implemented
OK0372 # 03 Y:1992 03 1992 KEEP LAMPS AND REFLECTORS CLEAN $4,890 $16,670 Implemented
OK0372 # 02 Y:1992 02 1992 INSTALL TIMERS AND/OR THERMOSTATS $3,782 $2,888 Implemented
OK0372 # 01 Y:1992 01 1992 RECOVER WASTE HEAT FROM EQUIPMENT $588 $807 Not Implemented
OK0241 # 01 Y:1987 01 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,960 $6,525 Not Implemented
OK0241 # 08 Y:1987 08 1987 INSTALL STEAM TRAP $612 $1,950 Implemented
OK0241 # 07 Y:1987 07 1987 INCREASE AMOUNT OF CONDENSATE RETURNED $82 $220 Implemented
OK0241 # 06 Y:1987 06 1987 INSTALL TURBULATORS $108 $220 Implemented
OK0241 # 05 Y:1987 05 1987 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $735 $2,083 Not Implemented
OK0241 # 04 Y:1987 04 1987 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,273 $1,050 Implemented
OK0241 # 03 Y:1987 03 1987 INSULATE BARE EQUIPMENT $297 $288 Implemented
OK0241 # 02 Y:1987 02 1987 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $148 $71 Implemented