IAC logo
IAC Assessment: OK0241
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OK0241
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oklahoma State University
Assessment Year 1987
Principal Product WESTERN WEAR CLOTHING
NAICS n/a
SIC 2329 - Men's and Boys' Clothing, Not Elsewhere Classified
Sales $1,000,000-$5,000,000
# of Employees 65
Plant Area (Sq.Ft.) 0
Annual Production 0 Units
Production Hrs. Annual 2,340
Location (State) OK
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $17,895 237,397 kWh $0.08
Natural Gas $10,045 2,338 MMBtu $4.30
TOTAL ENERGY COSTS $27,940
RECOMMENDED SAVINGS* $5,215 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,520
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,960
Cost:
$6,525
$1,960 22,274 - - $1,960
22,274
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$148
Cost:
$71
$148 586 - - $148
586
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$297
Cost:
$288
- - $297 69 -
-
kWh
$297
69
MMBtu
04: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,273
Cost:
$1,050
- - $1,273 296 -
-
kWh
$1,273
296
MMBtu
05: 2.7252 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM Savings:
$735
Cost:
$2,083
$735 7,913 - - $735
7,913
kWh
-
-
MMBtu
06: 2.1222 INSTALL TURBULATORS Savings:
$108
Cost:
$220
- - $108 25 -
-
kWh
$108
25
MMBtu
07: 2.2121 INCREASE AMOUNT OF CONDENSATE RETURNED Savings:
$82
Cost:
$220
- - $82 16 -
-
kWh
$82
16
MMBtu
08: 2.2111 INSTALL STEAM TRAP Savings:
$612
Cost:
$1,950
- - $612 142 -
-
kWh
$612
142
MMBtu
TOTAL RECOMMENDED Savings:
$5,215
Cost:
$12,407
$2,843 30,773 $2,372 548 $2,843
30,773
kWh
$2,372
548
MMBtu
TOTAL IMPLEMENTED Savings:
$2,520
Cost:
$3,799
$148 586 $2,372 548 $148
586
kWh
$2,372
548
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas