IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
Reset
SIC 234 Women's, Misses', Children's, And Infants'
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UU0089 # 04 Y:2005 04 2005 AIR CONDITION ONLY SPACE NECESSARY $33,020 $2,085 Not Implemented
UU0089 # 01 Y:2005 01 2005 OPTIMIZE PLANT POWER FACTOR $1,110 $4,290 Implemented
UU0089 # 05 Y:2005 05 2005 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $10,700 $2,000 Implemented
UU0089 # 02 Y:2005 02 2005 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,820 $1,500 Not Implemented
UU0089 # 03 Y:2005 03 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,940 $21,000 Not Implemented
UU0090 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,040 $500 Not Implemented
UU0090 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $4,540 $5,920 Not Implemented
UU0090 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,520 $4,570 Not Implemented
UU0090 # 01 Y:2005 01 2005 AIR CONDITION ONLY SPACE NECESSARY $11,500 $225 Implemented
SF0158 # 03 Y:1999 03 1999 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,087 $4,159 Not Implemented
SF0158 # 02 Y:1999 02 1999 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,055 $15,240 Not Implemented
SF0158 # 01 Y:1999 01 1999 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $896 $1,474 Not Implemented
SF0158 # 04 Y:1999 04 1999 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $7,327 $125 Not Implemented
BD0062 # 01 Y:1996 01 1996 INSTALL OCCUPANCY SENSORS $2,266 $2,400 Not Implemented
BD0062 # 02 Y:1996 02 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,507 $2,846 Not Implemented
BD0062 # 03 Y:1996 03 1996 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $552 $600 Not Implemented
BD0062 # 04 Y:1996 04 1996 INSTALL PARTITIONS TO REDUCE SIZE OF CONDITIONED SPACE $509 $80 Not Implemented
BD0062 # 05 Y:1996 05 1996 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $299 $388 Not Implemented
BD0062 # 06 Y:1996 06 1996 RECOVER WASTE HEAT FROM EQUIPMENT $336 $500 Not Implemented
BD0062 # 07 Y:1996 07 1996 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $229 $450 Not Implemented
BD0062 # 08 Y:1996 08 1996 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $7,821 $7,500 Not Implemented
BD0062 # 09 Y:1996 09 1996 MINIMIZE WATER USAGE $1,016 $2,275 Not Implemented
BD0062 # 10 Y:1996 10 1996 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $881 $2,245 Not Implemented
OD0043 # 02 Y:1995 02 1995 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,495 $1,756 Not Implemented
OD0043 # 01 Y:1995 01 1995 INSTALL TIMERS AND/OR THERMOSTATS $4,482 $1,755 Not Implemented