Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
842
matching recommendationsSIC | 239 | Misc. Fabricated Textile Products |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0101 # 05 Y:1983 | 05 | 1983 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $410 | $0 | Not Implemented |
GT0199 # 01 Y:1983 | 01 | 1983 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $4,320 | $6,100 | Implemented |
GT0199 # 02 Y:1983 | 02 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,149 | $2,491 | Not Implemented |
GT0199 # 03 Y:1983 | 03 | 1983 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $130 | $75 | Implemented |
GT0153 # 01 Y:1982 | 01 | 1982 | INSTALL TIMERS AND/OR THERMOSTATS | $4,196 | $903 | Not Implemented |
GT0153 # 02 Y:1982 | 02 | 1982 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,545 | $625 | Not Implemented |
GT0153 # 03 Y:1982 | 03 | 1982 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $2,945 | $9,000 | Not Implemented |
GT0153 # 04 Y:1982 | 04 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $6,549 | $0 | Not Implemented |
GT0153 # 05 Y:1982 | 05 | 1982 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $1,865 | $1,860 | Not Implemented |
KU0049 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $7,612 | $3,222 | Not Implemented |
KU0049 # 02 Y:1982 | 02 | 1982 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $42,700 | $0 | Not Implemented |
KU0049 # 03 Y:1982 | 03 | 1982 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $6,750 | $6,900 | Not Implemented |
KU0049 # 04 Y:1982 | 04 | 1982 | INSTALL AUTOMATIC STACK DAMPER | $399 | $65 | Not Implemented |
KU0049 # 05 Y:1982 | 05 | 1982 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $70 | $60 | Not Implemented |
UD0021 # 01 Y:1982 | 01 | 1982 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,609 | $576 | Implemented |
UD0021 # 02 Y:1982 | 02 | 1982 | INSTALL STORM WINDOWS AND DOORS | $330 | $314 | Implemented |
UD0021 # 03 Y:1982 | 03 | 1982 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $3,366 | $37,700 | Not Implemented |