IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,421

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0122 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,500 $0 Implemented
AM0122 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,350 $0 Implemented
AM0122 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $540 $1,270 Implemented
AM0122 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55 $14 Implemented
AM0122 # 07 Y:1991 07 1991 INSTALL SET-BACK TIMERS $170 $0 Implemented
OR0106 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,459 $0 Implemented
OR0106 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $13,315 $0 Implemented
OR0106 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,030 $20,000 Implemented
OR0106 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,238 $2,448 Implemented
OR0106 # 05 Y:1991 05 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,897 $40,925 Implemented
OR0101 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $484 $1,050 Implemented
OR0102 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $925 $1,950 Implemented
OR0103 # 01 Y:1990 01 1990 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $20,739 $26,000 Implemented
OR0103 # 04 Y:1990 04 1990 OPTIMIZE PLANT POWER FACTOR $2,800 $6,000 Implemented
OR0104 # 01 Y:1990 01 1990 OPTIMIZE PLANT POWER FACTOR $1,124 $2,400 Implemented
OR0105 # 01 Y:1990 01 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $37,102 $10,000 Implemented
OR0105 # 02 Y:1990 02 1990 OPTIMIZE PLANT POWER FACTOR $27,304 $21,600 Implemented
OR0105 # 03 Y:1990 03 1990 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,110 $9,180 Implemented
OR0105 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,013 $2,129 Implemented
OR0094 # 02 Y:1990 02 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $21,231 $26,775 Implemented
OR0094 # 04 Y:1990 04 1990 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,592 $2,987 Implemented
OR0094 # 05 Y:1990 05 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,207 $600 Implemented
OR0094 # 06 Y:1990 06 1990 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $10,805 $8,000 Implemented
OR0097 # 01 Y:1990 01 1990 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,683 $500 Implemented
OR0097 # 02 Y:1990 02 1990 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,133 $4,200 Implemented