IAC Assessment: OR0123
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0123
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product WALL PANELING
NAICS n/a
SIC 2435 - Hardwood Veneer And Plywood
Sales $1,000,000-$5,000,000
# of Employees 20
Plant Area (Sq.Ft.) 0
Annual Production 17 Thousand Feet
Production Hrs. Annual 2,000
Location (State) WA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,073 430,246 kWh $0.05
Natural Gas $19,191 4,147 MMBtu $4.63
TOTAL ENERGY COSTS $41,264
RECOMMENDED SAVINGS* $24,876 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $24,876
#|Description Savings
Cost
Status Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,687
Cost:
$4,200
$2,687 71,512 - - - - $2,687
71,512
kWh
-
-
MMBtu
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$3,011
Cost:
$4,800
$3,011 - - - - - $3,011
-
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,873
Cost:
-
$1,464 38,980 - - $1,409 - $1,464
38,980
kWh
-
-
MMBtu
$1,409
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$181
Cost:
$691
$181 4,982 - - - - $181
4,982
kWh
-
-
MMBtu
-
-
$
05: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$16,124
Cost:
-
$(-3,067) (-57,737) $19,191 4,147 - - $(-3,067)
(-57,737)
kWh
$19,191
4,147
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$24,876
Cost:
$9,691
$4,276 57,737 $19,191 4,147 $1,409 - $4,276
57,737
kWh
$19,191
4,147
MMBtu
$1,409
-
$
TOTAL IMPLEMENTED Savings:
$24,876
Cost:
$9,691
$4,276 57,737 $19,191 4,147 $1,409 - $4,276
57,737
kWh
$19,191
4,147
MMBtu
$1,409
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Natural Gas Administrative Changes Electricity Usage Natural Gas Administrative Changes