IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

139

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0083 # 05 Y:1996 05 1996 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $847 $2,000 Not Implemented
WV0083 # 06 Y:1996 06 1996 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,962 $2,884 Implemented
WV0083 # 07 Y:1996 07 1996 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $5,047 $5,400 Not Implemented
UD0380 # 01 Y:1992 01 1992 USE PLANT OWNED TRANSFORMERS OR LEASE TRANSFORMERS $37,776 $0 Not Implemented
UD0380 # 02 Y:1992 02 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $3,532 $3,452 Implemented
UD0380 # 03 Y:1992 03 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,531 $0 Implemented
UD0380 # 04 Y:1992 04 1992 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $17,539 $0 Not Implemented
UD0278 # 01 Y:1989 01 1989 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $2,746 $1,000 Not Implemented
UD0278 # 02 Y:1989 02 1989 RECOVER WASTE HEAT FROM EQUIPMENT $1,631 $1,000 Not Implemented
UD0278 # 03 Y:1989 03 1989 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $839 $450 Implemented
UD0278 # 04 Y:1989 04 1989 OPTIMIZE PLANT POWER FACTOR $2,600 $10,000 Not Implemented
UD0257 # 01 Y:1988 01 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,175 $2,800 Implemented
UD0257 # 02 Y:1988 02 1988 RECOVER WASTE HEAT FROM EQUIPMENT $621 $3,000 Not Implemented
UD0257 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $768 $1,000 Implemented
UD0257 # 04 Y:1988 04 1988 RECOVER WASTE HEAT FROM EQUIPMENT $4,290 $7,000 Not Implemented
UD0257 # 05 Y:1988 05 1988 RECOVER WASTE HEAT FROM EQUIPMENT $20,153 $80,000 Not Implemented
UD0203 # 01 Y:1986 01 1986 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $4,191 $15,000 Implemented
UD0203 # 02 Y:1986 02 1986 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,221 $1,000 Not Implemented
UD0203 # 03 Y:1986 03 1986 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,499 $4,200 Implemented
UD0203 # 04 Y:1986 04 1986 RECOVER WASTE HEAT FROM EQUIPMENT $1,021 $100 Implemented
UD0203 # 05 Y:1986 05 1986 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,888 $2,956 Not Implemented
UD0185 # 01 Y:1985 01 1985 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $33,827 $54,000 Implemented
UD0185 # 02 Y:1985 02 1985 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,629 $30,202 Implemented
UD0185 # 03 Y:1985 03 1985 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $2,108 $5,100 Not Implemented
UD0185 # 04 Y:1985 04 1985 USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS $3,556 $9,700 Not Implemented