IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

158

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IP0165 # 02 Y:2022 02 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $533 $23 Not Implemented
IP0165 # 01 Y:2022 01 2022 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $693 $0 Not Implemented
IP0165 # 03 Y:2022 03 2022 OPTIMIZE PLANT POWER FACTOR $6,564 $11,200 Not Implemented
IP0157 # 05 Y:2022 05 2022 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,064 $845 Not Implemented
IP0157 # 01 Y:2022 01 2022 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,715 $63 Not Implemented
IP0157 # 02 Y:2022 02 2022 UPGRADE CONTROLS ON COMPRESSORS $2,205 $219 Not Implemented
IP0157 # 06 Y:2022 06 2022 RECOVER WASTE HEAT FROM EQUIPMENT $4,143 $2,198 Not Implemented
IP0157 # 07 Y:2022 07 2022 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,072 $6,299 Not Implemented
IP0157 # 09 Y:2022 09 2022 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $12,808 $16,500 Not Implemented
IP0157 # 08 Y:2022 08 2022 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,868 $7,911 Not Implemented
IP0157 # 03 Y:2022 03 2022 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,303 $702 Not Implemented
IP0157 # 04 Y:2022 04 2022 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $666 $262 Not Implemented
IP0131 # 03 Y:2020 03 2020 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $8,015 $2,880 Not Implemented
IP0131 # 10 Y:2020 10 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,654 $60,600 Implemented
IP0131 # 09 Y:2020 09 2020 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $428 $1,430 Not Implemented
IP0131 # 08 Y:2020 08 2020 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,771 $31,062 Implemented
IP0131 # 07 Y:2020 07 2020 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,109 $1,524 Implemented
IP0131 # 06 Y:2020 06 2020 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,356 $1,500 Implemented
IP0131 # 05 Y:2020 05 2020 INSTALL OCCUPANCY SENSORS $1,682 $945 Not Implemented
IP0131 # 04 Y:2020 04 2020 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,385 $2,100 Not Implemented
IP0131 # 02 Y:2020 02 2020 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,581 $300 Implemented
IP0131 # 01 Y:2020 01 2020 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $3,141 $0 Not Implemented
IP0120 # 02 Y:2019 02 2019 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $835 $0 Implemented
IP0120 # 05 Y:2019 05 2019 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $473 $256 Implemented
IP0120 # 04 Y:2019 04 2019 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $223 $22 Implemented