IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

17

matching recommendations
Reset
SIC 24 Lumber And Wood Products
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MA0595 # 05 Y:2006 05 2006 INSULATE BARE EQUIPMENT $62 $150 Implemented
MA0595 # 04 Y:2006 04 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $935 $0 Implemented
MA0595 # 03 Y:2006 03 2006 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $5,019 $8,507 Not Implemented
MA0595 # 02 Y:2006 02 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,311 $27,000 Implemented
MA0595 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $32,853 $158,280 Not Implemented
MA0449 # 02 Y:1999 02 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,001 $12,150 Implemented
MA0449 # 07 Y:1999 07 1999 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $594 $0 Not Implemented
MA0449 # 06 Y:1999 06 1999 INSTALL / REPAIR INSULATION ON STEAM LINES $1,706 $2,000 Implemented
MA0449 # 05 Y:1999 05 1999 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $2,304 $6,042 Not Implemented
MA0449 # 04 Y:1999 04 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,481 $24,400 Not Implemented
MA0449 # 03 Y:1999 03 1999 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $3,594 $24,400 Not Implemented
MA0449 # 01 Y:1999 01 1999 USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT $69,817 $255,600 Not Implemented
MA0136 # 01 Y:1989 01 1989 INSTALL SET-BACK TIMERS $422 $892 Implemented
MA0136 # 02 Y:1989 02 1989 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,244 $480 Not Implemented
MA0136 # 03 Y:1989 03 1989 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $1,017 $1,400 Implemented
MA0136 # 04 Y:1989 04 1989 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $372 $200 Not Implemented
MA0136 # 05 Y:1989 05 1989 RESCHEDULE AND REARRANGE MULTIPLE-SOURCE HEATING SYSTEMS $2,595 $3,602 Not Implemented