Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,465
matching recommendationsSIC | 242 | Sawmills And Planing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
BS0145 # 04 Y:2021 | 04 | 2021 | REPAIR OR REPLACE STEAM TRAPS | $22,793 | $7,115 | Not Implemented |
BS0145 # 05 Y:2021 | 05 | 2021 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,246 | $3,700 | Not Implemented |
AM0810 # 01 Y:2020 | 01 | 2020 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $5,200 | $1,000 | Implemented |
AM0810 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,320 | $1,680 | Implemented |
AM0810 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,410 | $180 | Implemented |
AM0810 # 04 Y:2020 | 04 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,245 | $2,670 | Implemented |
AM0810 # 05 Y:2020 | 05 | 2020 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $370 | $50 | Implemented |
AM0810 # 06 Y:2020 | 06 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $290 | $20 | Implemented |
UA0226 # 01 Y:2020 | 01 | 2020 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $219,577 | $400 | Not Implemented |
UA0226 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,587 | $42,000 | Not Implemented |
UA0226 # 03 Y:2020 | 03 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $15,732 | $150 | Not Implemented |
UA0226 # 04 Y:2020 | 04 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,733 | $50 | Implemented |
UA0226 # 05 Y:2020 | 05 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,464 | $2,170 | Implemented |
UA0226 # 06 Y:2020 | 06 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,164 | $309 | Implemented |
UA0225 # 01 Y:2020 | 01 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $18,563 | $12,609 | Implemented |
UA0225 # 02 Y:2020 | 02 | 2020 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,568 | $8,775 | Implemented |
UA0225 # 03 Y:2020 | 03 | 2020 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,691 | $50 | Implemented |
UA0225 # 04 Y:2020 | 04 | 2020 | MODIFY STARTUP/SHUTDOWN TIMES | $12,578 | $150 | Not Implemented |
NC0646 # 01 Y:2020 | 01 | 2020 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $377,240 | $300,000 | Implemented |
NC0646 # 02 Y:2020 | 02 | 2020 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $225 | $778 | Not Implemented |
NC0646 # 03 Y:2020 | 03 | 2020 | INSULATE GLAZING, WALLS, CEILINGS, AND ROOFS | $188 | $83 | Not Implemented |
NC0646 # 04 Y:2020 | 04 | 2020 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $694 | $362 | Implemented |
NC0646 # 05 Y:2020 | 05 | 2020 | OPTIMIZE PLANT POWER FACTOR | $2,484 | $7,500 | Not Implemented |
NC0646 # 06 Y:2020 | 06 | 2020 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $4,817 | $6,709 | Not Implemented |
UA0223 # 01 Y:2020 | 01 | 2020 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $965 | $562 | Implemented |