Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
18
matching recommendationsSIC | 242 | Sawmills And Planing Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KU0074 # 02 Y:1983 | 02 | 1983 | REDUCE FLUID FLOW RATES | $26,145 | $2,920 | Implemented |
KU0074 # 12 Y:1983 | 12 | 1983 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $205 | $150 | Implemented |
KU0074 # 11 Y:1983 | 11 | 1983 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $345 | $0 | Implemented |
KU0074 # 10 Y:1983 | 10 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $897 | $0 | Implemented |
KU0074 # 09 Y:1983 | 09 | 1983 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $851 | $306 | Implemented |
KU0074 # 08 Y:1983 | 08 | 1983 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $12,687 | $9,759 | Implemented |
KU0074 # 07 Y:1983 | 07 | 1983 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $841 | $238 | Implemented |
KU0074 # 06 Y:1983 | 06 | 1983 | REPAIR AND ELIMINATE STEAM LEAKS | $2,905 | $100 | Implemented |
KU0074 # 05 Y:1983 | 05 | 1983 | INSTALL / REPAIR INSULATION ON STEAM LINES | $1,448 | $358 | Implemented |
KU0074 # 04 Y:1983 | 04 | 1983 | REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC | $4,370 | $1,756 | Implemented |
KU0074 # 03 Y:1983 | 03 | 1983 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $14,284 | $5,200 | Implemented |
KU0074 # 01 Y:1983 | 01 | 1983 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $24,439 | $1,400 | Implemented |
KU0055 # 01 Y:1982 | 01 | 1982 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $311 | $520 | Implemented |
KU0055 # 02 Y:1982 | 02 | 1982 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $28,915 | $1,400 | Not Implemented |
KU0055 # 03 Y:1982 | 03 | 1982 | KEEP SOLID FUELS / RAW MATERIALS DRY | $14,171 | $0 | Not Implemented |
KU0055 # 04 Y:1982 | 04 | 1982 | REPLACE BROKEN WINDOWS AND/OR WINDOW SASH | $15,482 | $500 | Implemented |
KU0055 # 05 Y:1982 | 05 | 1982 | OPTIMIZE PLANT POWER FACTOR | $2,061 | $1,800 | Implemented |
KU0055 # 06 Y:1982 | 06 | 1982 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $66,400 | $240,000 | Not Implemented |