IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

58

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
GT0753 # 02 Y:2003 02 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,800 $2,500 Implemented
GT0753 # 01 Y:2003 01 2003 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $3,610 $5,000 Implemented
GT0535 # 03 Y:1994 03 1994 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,505 $22,420 Not Implemented
GT0535 # 04 Y:1994 04 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $100 $940 Implemented
GT0535 # 02 Y:1994 02 1994 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $4,230 $0 Not Implemented
GT0535 # 01 Y:1994 01 1994 CHECK FOR ACCURACY OF UTILITY / POWER METERS $12,502 $0 Implemented
GT0484 # 06 Y:1992 06 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,470 $150 Not Implemented
GT0484 # 05 Y:1992 05 1992 TURN OFF EQUIPMENT WHEN NOT IN USE $1,360 $800 Not Implemented
GT0484 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $420 $600 Not Implemented
GT0484 # 03 Y:1992 03 1992 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $5,250 $1,400 Not Implemented
GT0484 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,660 $0 Not Implemented
GT0484 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,657 $206,050 Not Implemented
GT0482 # 04 Y:1992 04 1992 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,390 $1,250 Implemented
GT0482 # 01 Y:1992 01 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $8,400 $190,520 Implemented
GT0482 # 02 Y:1992 02 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $11,250 $0 Implemented
GT0482 # 03 Y:1992 03 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $815 $2,520 Implemented
GT0482 # 05 Y:1992 05 1992 DISCONNECT BALLASTS $400 $0 Implemented
GT0482 # 06 Y:1992 06 1992 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $141,380 $750,000 Implemented
GT0471 # 07 Y:1992 07 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $750 $2,210 Not Implemented
GT0471 # 06 Y:1992 06 1992 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $149 $0 Not Implemented
GT0471 # 05 Y:1992 05 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $217 $10,400 Not Implemented
GT0471 # 04 Y:1992 04 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $836 $1,510 Not Implemented
GT0471 # 03 Y:1992 03 1992 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $724 $200 Not Implemented
GT0471 # 02 Y:1992 02 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $253 $150 Not Implemented
GT0471 # 01 Y:1992 01 1992 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $493 $0 Not Implemented