IAC Assessment: GT0482
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: GT0482
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Georgia Institute of Technology
Assessment Year 1992
Principal Product KILN-DRIED LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 126
Plant Area (Sq.Ft.) 0
Annual Production 100,000 Thousand Feet
Production Hrs. Annual 4,000
Location (State) GA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $935,593 13,698,711 kWh $0.07
Natural Gas $12,722 2,176 MMBtu $5.85
Fuel Oil #2 $52,722 9,553 MMBtu $5.52
TOTAL ENERGY COSTS $1,001,037
RECOMMENDED SAVINGS* $163,635 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $163,635
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,400
Cost:
$190,520
$8,400 124,560 - - - - $8,400
124,560
kWh
-
-
MMBtu
-
-
$
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,250
Cost:
-
$11,250 164,713 - - - - $11,250
164,713
kWh
-
-
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$815
Cost:
$2,520
$961 14,068 - - $(-146) - $961
14,068
kWh
-
-
MMBtu
$(-146)
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,390
Cost:
$1,250
$1,390 20,516 - - - - $1,390
20,516
kWh
-
-
MMBtu
-
-
$
05: 2.7122 DISCONNECT BALLASTS Savings:
$400
Cost:
-
$400 5,862 - - - - $400
5,862
kWh
-
-
MMBtu
-
-
$
06: 2.3192 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS Savings:
$141,380
Cost:
$750,000
$156,000 150,059 $(-9,620) (-1,800) $(-5,000) - $156,000
150,059
kWh
$(-9,620)
(-1,800)
MMBtu
$(-5,000)
-
$
TOTAL RECOMMENDED Savings:
$163,635
Cost:
$944,290
$178,401 479,778 $(-9,620) (-1,800) $(-5,146) - $178,401
479,778
kWh
$(-9,620)
(-1,800)
MMBtu
$(-5,146)
-
$
TOTAL IMPLEMENTED Savings:
$163,635
Cost:
$944,290
$178,401 479,778 $(-9,620) (-1,800) $(-5,146) - $178,401
479,778
kWh
$(-9,620)
(-1,800)
MMBtu
$(-5,146)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Fuel Oil #2 Administrative Changes Electricity Usage Fuel Oil #2 Administrative Changes