IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,886

matching recommendations
Reset
SIC 2421 Sawmills And Planing Mills, General
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0437 # 06 Y:1991 06 1991 OPTIMIZE PLANT POWER FACTOR $7,990 $18,925 Implemented
TN0423 # 01 Y:1991 01 1991 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $224,192 $0 Not Implemented
TN0423 # 02 Y:1991 02 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $5,443 $2,415 Not Implemented
TN0423 # 03 Y:1991 03 1991 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $974 $285 Not Implemented
TN0423 # 04 Y:1991 04 1991 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $310 $0 Not Implemented
TN0423 # 05 Y:1991 05 1991 USE DEMAND CONTROLLER OR LOAD SHEDDER $8,200 $13,500 Not Implemented
TN0423 # 06 Y:1991 06 1991 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,130 $0 Not Implemented
AM0122 # 01 Y:1991 01 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,156 $748 Implemented
AM0122 # 02 Y:1991 02 1991 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $1,500 $0 Implemented
AM0122 # 03 Y:1991 03 1991 IMPROVE LUBRICATION PRACTICES $1,350 $0 Implemented
AM0122 # 04 Y:1991 04 1991 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $540 $1,270 Implemented
AM0122 # 05 Y:1991 05 1991 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $503 $0 Not Implemented
AM0122 # 06 Y:1991 06 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $55 $14 Implemented
AM0122 # 07 Y:1991 07 1991 INSTALL SET-BACK TIMERS $170 $0 Implemented
OR0112 # 01 Y:1991 01 1991 INSULATE FEEDWATER TANK $976 $532 Not Implemented
OR0112 # 02 Y:1991 02 1991 OPTIMIZE PLANT POWER FACTOR $742 $750 Not Implemented
OR0112 # 03 Y:1991 03 1991 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $229 $0 Not Implemented
OR0112 # 04 Y:1991 04 1991 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $500 $1,048 Not Implemented
OR0112 # 05 Y:1991 05 1991 INSULATE BARE EQUIPMENT $12,011 $40,000 Not Implemented
OR0112 # 06 Y:1991 06 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $62 $195 Not Implemented
OR0112 # 07 Y:1991 07 1991 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,574 $7,400 Not Implemented
OR0106 # 01 Y:1991 01 1991 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $5,459 $0 Implemented
OR0106 # 02 Y:1991 02 1991 INSTALL SET-BACK TIMERS $13,315 $0 Implemented
OR0106 # 03 Y:1991 03 1991 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $30,030 $20,000 Implemented
OR0106 # 04 Y:1991 04 1991 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,238 $2,448 Implemented