IAC Assessment: OR0129
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OR0129
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Oregon State University
Assessment Year 1991
Principal Product DIMENSIONAL LUMBER
NAICS n/a
SIC 2421 - Sawmills And Planing Mills, General
Sales $10,000,000-$50,000,000
# of Employees 125
Plant Area (Sq.Ft.) 0
Annual Production 70,000 Thousand Feet
Production Hrs. Annual 8,736
Location (State) OR
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $387,248 9,431,126 kWh $0.04
Wood $330,572 483,630 MMBtu $0.68
TOTAL ENERGY COSTS $717,820
RECOMMENDED SAVINGS* $103,284 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $103,284
#|Description Savings
Cost
Status Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes
$ kWh $ MMBtu $ $
01: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,102
Cost:
-
$1,102 23,154 - - - - $1,102
23,154
kWh
-
-
MMBtu
-
-
$
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$4,277
Cost:
-
$10,517 - - - $(-6,240) - $10,517
-
kWh
-
-
MMBtu
$(-6,240)
-
$
03: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$19,236
Cost:
$30,000
- - $19,236 28,141 - - -
-
kWh
$19,236
28,141
MMBtu
-
-
$
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$1,626
Cost:
-
$1,381 33,705 - - $245 - $1,381
33,705
kWh
-
-
MMBtu
$245
-
$
05: 2.2441 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT Savings:
$3,068
Cost:
$3,066
- - $3,068 4,484 - - -
-
kWh
$3,068
4,484
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,072
Cost:
-
$1,232 31,946 - - $(-160) - $1,232
31,946
kWh
-
-
MMBtu
$(-160)
-
$
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$31,573
Cost:
$40,000
$31,573 779,895 - - - - $31,573
779,895
kWh
-
-
MMBtu
-
-
$
08: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$522
Cost:
$864
- - $522 763 - - -
-
kWh
$522
763
MMBtu
-
-
$
09: 2.2122 INSTALL / REPAIR INSULATION ON CONDENSATE LINES Savings:
$790
Cost:
$1,430
- - $790 1,156 - - -
-
kWh
$790
1,156
MMBtu
-
-
$
10: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,172
Cost:
-
$1,615 43,669 - - $557 - $1,615
43,669
kWh
-
-
MMBtu
$557
-
$
11: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$12,146
Cost:
$26,250
$12,146 - - - - - $12,146
-
kWh
-
-
MMBtu
-
-
$
12: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$952
Cost:
$2,150
$952 22,567 - - - - $952
22,567
kWh
-
-
MMBtu
-
-
$
13: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$3,521
Cost:
$15,000
$3,521 87,046 - - - - $3,521
87,046
kWh
-
-
MMBtu
-
-
$
14: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$21,227
Cost:
$64,975
$21,227 647,421 - - - - $21,227
647,421
kWh
-
-
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$103,284
Cost:
$183,735
$85,266 1,669,403 $23,616 34,544 $(-5,598) - $85,266
1,669,403
kWh
$23,616
34,544
MMBtu
$(-5,598)
-
$
TOTAL IMPLEMENTED Savings:
$103,284
Cost:
$183,735
$85,266 1,669,403 $23,616 34,544 $(-5,598) - $85,266
1,669,403
kWh
$23,616
34,544
MMBtu
$(-5,598)
-
$
Savings
Cost
$ kWh $ MMBtu $ $
Electricity Usage Wood Administrative Changes Electricity Usage Wood Administrative Changes