Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
521
matching recommendationsSIC | 2426 | Hardwood Dimension & Flooring Mills |
---|
Row Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
KS2427 # 06 Y:2024 | 06 | 2024 | USE SOLAR HEAT TO MAKE ELECTRICTY | $45,498 | $453,376 | n/a |
KS2427 # 02 Y:2024 | 02 | 2024 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,216 | $90 | n/a |
KS2427 # 03 Y:2024 | 03 | 2024 | USE OPTIMUM THICKNESS INSULATION | $9,550 | $6,688 | n/a |
KS2427 # 05 Y:2024 | 05 | 2024 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $50,928 | $156,644 | n/a |
KS2427 # 01 Y:2024 | 01 | 2024 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,324 | $5,480 | n/a |
KS2427 # 04 Y:2024 | 04 | 2024 | USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING | $69,076 | $156,917 | n/a |
WV0655 # 05 Y:2023 | 05 | 2023 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $11,873 | $10,662 | n/a |
WV0655 # 04 Y:2023 | 04 | 2023 | UPGRADE CONTROLS ON COMPRESSORS | $11,948 | $11,050 | n/a |
WV0655 # 06 Y:2023 | 06 | 2023 | INSULATE BARE EQUIPMENT | $8,192 | $5,240 | n/a |
WV0655 # 03 Y:2023 | 03 | 2023 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $12,350 | $1,500 | n/a |
WV0655 # 11 Y:2023 | 11 | 2023 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $324 | $359 | n/a |
WV0655 # 07 Y:2023 | 07 | 2023 | OPTIMIZE PLANT POWER FACTOR | $6,154 | $4,905 | n/a |
WV0655 # 02 Y:2023 | 02 | 2023 | USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) | $39,676 | $165,000 | n/a |
WV0655 # 01 Y:2023 | 01 | 2023 | USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER | $50,347 | $17,230 | n/a |
WV0655 # 09 Y:2023 | 09 | 2023 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,005 | $7,828 | n/a |
WV0655 # 08 Y:2023 | 08 | 2023 | DEVELOP A REPAIR/REPLACE POLICY | $4,078 | $12,517 | n/a |
WV0655 # 10 Y:2023 | 10 | 2023 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,641 | $210 | n/a |
TT0301 # 04 Y:2023 | 04 | 2023 | TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME | $9,607 | $0 | n/a |
TT0301 # 02 Y:2023 | 02 | 2023 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $40,702 | $210,000 | n/a |
TT0301 # 06 Y:2023 | 06 | 2023 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $7,899 | $1,500 | n/a |
TT0301 # 03 Y:2023 | 03 | 2023 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $32,720 | $15,200 | n/a |
TT0301 # 05 Y:2023 | 05 | 2023 | SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING | $8,886 | $220 | n/a |
TT0301 # 01 Y:2023 | 01 | 2023 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $47,506 | $76,760 | n/a |
UA0226 # 01 Y:2020 | 01 | 2020 | BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT | $219,577 | $400 | Not Implemented |
UA0226 # 02 Y:2020 | 02 | 2020 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $15,587 | $42,000 | Not Implemented |