IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

521

matching recommendations
Reset
SIC 2426 Hardwood Dimension & Flooring Mills
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
KS2427 # 06 Y:2024 06 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $45,498 $453,376 n/a
KS2427 # 02 Y:2024 02 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,216 $90 n/a
KS2427 # 03 Y:2024 03 2024 USE OPTIMUM THICKNESS INSULATION $9,550 $6,688 n/a
KS2427 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $50,928 $156,644 n/a
KS2427 # 01 Y:2024 01 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,324 $5,480 n/a
KS2427 # 04 Y:2024 04 2024 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $69,076 $156,917 n/a
WV0655 # 05 Y:2023 05 2023 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,873 $10,662 n/a
WV0655 # 04 Y:2023 04 2023 UPGRADE CONTROLS ON COMPRESSORS $11,948 $11,050 n/a
WV0655 # 06 Y:2023 06 2023 INSULATE BARE EQUIPMENT $8,192 $5,240 n/a
WV0655 # 03 Y:2023 03 2023 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,350 $1,500 n/a
WV0655 # 11 Y:2023 11 2023 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $324 $359 n/a
WV0655 # 07 Y:2023 07 2023 OPTIMIZE PLANT POWER FACTOR $6,154 $4,905 n/a
WV0655 # 02 Y:2023 02 2023 USE STEAM CONDENSATE FOR HOT WATER SUPPLY (NON-POTABLE) $39,676 $165,000 n/a
WV0655 # 01 Y:2023 01 2023 USE FLUE GASES TO HEAT PROCESS OR SERVICE WATER $50,347 $17,230 n/a
WV0655 # 09 Y:2023 09 2023 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,005 $7,828 n/a
WV0655 # 08 Y:2023 08 2023 DEVELOP A REPAIR/REPLACE POLICY $4,078 $12,517 n/a
WV0655 # 10 Y:2023 10 2023 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,641 $210 n/a
TT0301 # 04 Y:2023 04 2023 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $9,607 $0 n/a
TT0301 # 02 Y:2023 02 2023 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT $40,702 $210,000 n/a
TT0301 # 06 Y:2023 06 2023 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,899 $1,500 n/a
TT0301 # 03 Y:2023 03 2023 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $32,720 $15,200 n/a
TT0301 # 05 Y:2023 05 2023 SUBSTITUTE COMPRESSED AIR COOLING WITH WATER OR AIR COOLING $8,886 $220 n/a
TT0301 # 01 Y:2023 01 2023 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $47,506 $76,760 n/a
UA0226 # 01 Y:2020 01 2020 BURN WASTE TO PRODUCE STEAM TO DRIVE A STEAM TURBINE GENERATOR SET AND USE STEAM EXHAUST FOR HEAT $219,577 $400 Not Implemented
UA0226 # 02 Y:2020 02 2020 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $15,587 $42,000 Not Implemented